628
NTE increase for CO 327, T-Plant Sludge Acceleration
626
Issue Change Order 330, “Continued 100-K Remediation Activities in FY 2018
624
Increase the NTE for CO 328, Additional 300-296 Work Scope
620
Increase the NTE cost authority authorized for Change Orders 327, Sludge Acceleration and 319, Garnet Filter Media Removal
615
Increase NTE for CO 311, Emergency Response for Facility/Waste Site ESH&Q or Remediation
614
FY17 RFS Funding
613
FY17 Funding
612
FY17 Base Funding
611
Issue Change Order 329, Purex Recovery and Stabilization
610
FY17 Base Funding
607
Increase NTE for CO 311, Emergency Response for Facility/Waste Site ESH&Q or Remediation
606
Definitize Change Order 309, Develop and Submit to RL Data Quality Objectives for Assessing the Structural Integrity for the PUREX Tunnels 1 and 2
605
Issue Change Order 328, authorizing CHPRC to perform 324 building modifications required to support soil removal; procure and install equipment, systems, and components in 324 building required for B-cell and soil removal operations; perform B-Cell grout and debris removal to establish conditions for floor removal
604
FY17 Base Funding
603
increase the Not-To-Exceed (NTE) cost authority for Change Order 326, 105-K West Fuel Storage Basin Characterization.
602
Increase the Not-To-Exceed (NTE) cost authority for Change Order 319, Garnet Filter Media Removal
601
Increase the Not-To-Exceed (NTE) cost authority for Change Order 306, ERDF, 618-10 Burial Grounds, etc.
600
Increase the Not-To-Exceed (NTE) cost authority for Change Order 305, 300-296 Waste Site Design Review.
599
Increase the Not-To-Exceed (NTE) cost authority for Change Order 304, “Initiate RCCC Transition.
598
Definitize REA 013 1591, Submit Solid Waste Operations Complex Part B Permit Modification Request
597
Number Not Used
596
Update Section I.141, Access to and Ownership of Records.
595
Issue change order 327, Sludge Removal Project (SRP) Acceleration of 105KW and T Plant.
594
Definitize Change Order 312, Biomobilization and Biointrusion Evaluation Sampling and Analysis Plan
593
NTE Increase for CO 318 & Revision of CO Scope
592
Number Not Used
591
FY17 RFS Funding
590
FY17 Funding
589
Updates Section C, Table C.5, Summary of Contract Deliverables.
588
J.3 Update for RCRA Permit
587
Increase the Not-To-Exceed (NTE) cost authority for Change Order 307, 100K Area Waste Site Quantity Increase
586
Increase the Not-To-Exceed (NTE) cost authority for Change Order 306, ERDF, 618-10 Burial Grounds, etc.
585
Increase the Not-To-Exceed (NTE) cost authority for Change Order 305, 300-296 Waste Site Design Review
584
Increase the Not-To-Exceed (NTE) cost authority for Change Order 304, Initiate RCCC Transition
583
Increase NTE for CO 321, Contract Attachment J.3 Interface #25 Revision
582
Issues the notice-to-proceed (NTP) with a not-to-exceed (NTE) authorization limit of $750,000 for Change Order 320, Sand Filter Media Retrieval System
581
Issues the notice-to-proceed (NTP) with a not-to-exceed (NTE) authorization limit of $750,000 for Change Order 319, Garnet Filter Media Retrieval
580
Increase NTE for CO 311, Emergency Response for Facility/Waste Site ESH&Q or Remediation
579
FY17 Funding
578
Issues the notice-to-proceed (NTP) with a not-to-exceed (NTE) authorization limit of $750,000 for Change Order 326, 105-K West Fuel Storage Basin Characterization
577
Issue Change Order 325, Implementation of CRD 474.2 Change 3, with Richland Requirements Document RRD-009
576
FY17 Funding
575
Issue Change Order 324, Miscellaneous PBS RL-0040 Work Scope
574
Revisions to Section J.2
573
Increase NTE for Change Order 314, Outside Storage Area Closure Plan Revisions
572
definitizes the scope for the purchase of one Gamma-Ray Imaging Spectrometer in support of 100-K Deactivation activities
571
Issue Change Order 323, Management of the Hanford Sitewide Transportation Safety Document
570
I Clause update-Veterans Employment Report
569
Issue Change Order 318, 200-WA-1 and 200-BC-1 Operable Units Characterization
568
FY 17 Funding
567
Issue Change Order 321, Contract Attachment J.3 Interface #25 Revision
566
Update Section H
565
Increase NTE for Change Order 307, 100K Area Waste Site Quantity Increase
564
Increase NTE for Change Order 306, ERDF, 618-10 Burial Grounds, etc
563
Increase NTE for Change Order 305, 300-296 Waste Site Design Review
562
FY17 Funding
561
Issue Change Order 322, Integrated Disposal Facility Revised Operational Requirements
560
FY17 Funding
559
Definitize Change 289, Transition Planning for Transfer of Scope from RCCC to PRC
558
Increase NTE for Change Order 312, Biomobilization and Biointrusion Evaluation Plan
557
Clause B.15 Reconciliation
556
Administrative Changes to Update Section J.3, J.13, and J.14
555
Increase NTE for Change Order 311, Emergency Response for Facility/Waste Site ESH&Q or Remediation
554
Increase NTE for Change Order 311, Emergency Response for Facility/Waste Site ESH&Q or Remediation
553
Increase NTE for Change Order 309, Develop and Submit to RL Data Quality Objectives for Assessing the Structural integrity for the PUREX Tunnels 1 and 2
552
FY 17 Funding
551
Issue Change Order 316, Groundwater Engineering Reports and Groundwater Monitoring Plans for Dangerous Waste Management Units (DWMU)
550
Issue Change Order 315, Debris Cleanup
549
Issue Change Order 314, Outside Storage Area Closure Plan Revisions
548
FY 17 Funding
547
Issue Change Order 313 to initiate characterization/sampling analysis of the 236-Z and 242-Z Facilities
546
Increase the NTE for Change Order 307, 100K Waste Sites
545
Update Section J.10, Wage Determinations
544
FY17 PEMP and Incremental Funding
543
Update I.107, FAR 52.245-1, Government Property, and Add I.107-A, FAR 52.245-9, Uses and Charges
542
Funding
541
Modification No. 541, “RFS Funding”
540
Modification No. 540, “FY16 Funding”
539
Modification No. 539, “Update Attachment J.6, Small Business Subcontract Plan”
537
Increase NTE for Change Order 305
536
Increase NTE for Change Order 304
535
Issue Change Order 312, Biomobilization and Biointrusion Evaluation Sampling and Analysis
534
WFO Funding
532
Definitizes REA 030 1566, Finalize micro-Purge/Low-Flow Sampling Evaluation
533
FY 16 Incremental Funding
531
Modification No. 531, “RFS Funding”
530
Modification No. 530, “RFS Funding”
529
FY 16 Incremental Funding
528
Issue Change Order 311, Emergency Response for Facility/Waste Site ESH&Q or Remediation
527
Issue Change Order 310, Solid Waste Operations Complex Hazards Mitigation Activities
526
Issue Change Order 309, Develop and submit to RL Data Quality objectives for Assessing the Structural Integrity for the PUREX Tunnels 1 and 2
525
Definitize Change Order 269, Waste Encapsulation and Storage Facility (WESF) K3 Ventilation and Stabilization Project Implementation
524
Funding
523
Definitizes Change Order 303, 100-BC-5 Automated Water Level Network.
522
Definitizes Change Order 300, 100-KW-Garnet Filter Remediation
521
Issue Change Order 307, 100K Area Waste Site Quantity Increase, to continue remediation in the 100K area during FY16
520
Definitize Change Order 301, 100-KW-Sand Filter Media Remediation
519
FY16 Incremental Funding
518
H.29 Responsible Corporate Official Update
517
Add H.53 Prohibition on Funding for Certain Nondisclosure Agreements
516
Increase NTE for Change Order 269, WESF K3 Ventilation and Stabilization Project Implementation
515
FY16 Incremental Funding
514
Update H.31, Lobbying Restriction
513
FY16 Incremental Funding
512
H.15 Key Personnel Update
511
FY16 Incremental Funding
510
Update Attachment J.9, Special Financial Institution Account Agreement
509
Issue Change Order 306, Incorporating the remainder of River Corridor Closure Project transition activities into the Plateau Remediation Contract.
508
Issue Change Order 305, 300-296 Waste Site Design Revision and Hot Cell/Airlock Debris Removal
507
FY16 Incremental Funding
506
FY16 Incremental Funding
505
Increases the NTE value for Change Order 304 and revises the scope of work issued under change order 304.
504
FY16 Incremental Funding
503
RFS Funding
502
Incremental Funding
501
Incremental Funding
500
Definitize Change Order 293, 100-BC-d RI-FS Decisional Re-Write
499
Update Section H.2 Employee Compensation: Pay and Benefits
498
Incremental Funding
497
Definitize Change Order 297, PFP Slab Removal Documentation
496
Definitize REA 040 1449, Surveillance, maintenance and decommissioning for 200-ZP-1 Process Facility and Ancillary Buildings
495
Increase NTE for Change Order 301, 100-KW Sand Filter Media Remediation
494
Update Change Order 300, 100-KW Garnet Filter Media Remediation
493
Analytical Services Fee
492
CLIN 7 Deduction
491
7 Fee Adjustment
490
Increase NTE for Change Order 269, WESF K3 Ventilation and Stabilization Project Implementation
489
Incremental Funding
488
Definitize Change Order 276, “Additional WESF Occupancy
487
Definitize Change Order 266, 200-BP-5 operable unit Construction and Operation and Maintenance of Transfer Pipelines
486
Definitize Change Order 279, Solid Waste Information and Tracking System (SWITS) Bar Code Reader
485
Definitize Change Order 263, Environmental Restoration Disposal Facility Leachate Transfer Line
484
Definitize Change Order 298, 200-IS-1 Waste Site Change Package and Work Plan Update
483
Issue Change Order 304, Initiate Transition of River Corridor Contract Scope Activities into the Plateau Remediation Contract
482
Definitize REA-012-1519, Sludge Project Sequestration Impacts
481
Cancel Change Order 302, Initiate Transition of River Corridor Contract Scope into the Plateau Remediation Contract
480
Issue Change Order 302, Initiate Transition of River Corridor Contract scope into the Plateau Remediation Contract
479
Definitize Change Order 282, "Burial Ground CA/HCAs to URMAs
478
Incremental Funding
477
2015 Wage Determination Update
476
Add DOE-0336, Rev 2A, Hanford Site Lockout/Tagout Procedure
475
Definitize Change Order 190, Lysimeter Test Facility
474
Definitize REA 013 1538, 231-Z-DR-11, Concrete Box Mitigation
473
Definitize Change Order 291, 200-IS-1 WIDS Information
472
Definitize Change Order 280, CWC Emergency Lighting
471
Definitize Change Order 278, Procure DOT Type 7A large Shipping Container (Super 7A)
470
Definitize CO295, 200 IS-1 Geological Interface Segmentation
469
FY16 Incremental Funding
468
Incremental Funding
467
Issue Change Order 303, BC-5 Automated Water Level Network
466
Modification 466, “NTE Increase for CO 289, Transfer of River Corridor Closure Contract (RCCC) work scope to CHPRC.
465
Accounting Code Change
464
Incremental Funding
463
Definitize Change Order 274, Central Waste Complex Box Non-Destructive Assay Campaign
462
FY16 Incremental Funding
461
Definitize Change Order 296, Assignment of Unassigned waste Sites in WIDS
460
Definitize Change Order 277, Super 7A Trailer
459
Replace CRD M 470.4-1 with CRD O 470.4B
458
Increase NTE for Change Order 266, 200-BP-5 Operable Unit Construction and Operation and Maintenance of Transfer Pipelines.
457
Issue Change Order 301, 100-KW Sand Filter Media Remediation
456
Issue Change Order 300, 100-KW Garnet Filter Mediation Remediation
455
Definitize Change Order 292, 200-SW-2 Remedial Investigation/Feasibility Study Aerial Radiological Survey
454
Accounting Code Change
453
Increase NTE for Change Order 293, Environmental Restoration Disposal Facility (ERDF) Transfer Pipeline Construction
452
Definitize Change Order 272, Build and Implement Portable Remediation Treatment System
451
FY16 Funding
450
Definitize Change Order 271, TPA Administrative Record Upgrade
449
Increase NTE for Change Order NTE 293, 100-BC-5 RI/FS Decisional Draft Re-Write
448
Updates Contract Clause H.52 from “Conference Spending” to “Conference Management.”
447
Cancels Change Orders 270, PFP 243ZA sump pit piping, equipment and tank(s) removal and disposal during demolition; 275, Enhanced RCRA Compliance; and 281, ISA Security Enhancements.
446
Clarify the NTE cost authority for Change Order No. 299, 200 West Pump & Treat System Membrane Bioreactor Cassette Additions.
445
Cost & Fee Transfer (B-1 & B-2) Related to ETF transfer to ORP.
444
Increases the NTE for Change Order 266, 200-BP-5 Operable Unit Construction and Operation and Maintenance of Transfer Pipelines.
443
FY 15 Incremental Funding
442
Issue Change Order 299, 200 West Pump & Treatment System Membrane Bioreactor Cassette Additions.
441
Reallocation of available fee for fiscal years (FY) 2016 through 2018 in order to align the Contract with the anticipated FY2016 Award Fee Plan.
440
Increases the NTE cost authority for Change Order No. 276, Additional WESF Occupancy.
439
Incorporates the Performance Evaluation Measurement Plan (PEMP) for Fiscal Year 2016 into Section J.4 of the contract.
438
Incremental Funding
437
Incremental Funding
436
Removal of DOE M 413.3-1
435
Definitize CO 290, Canister Storage Building Stack Modeling
434
Issue Change Order 298, 200-IS-1 Waste Site Change Package and Work Plan Update.
433
Issue Change Order 297, PFP Slab Removal Documentation
432
Definitize Change Order 267, 200-UP-1 SE Chromium Plume Characterization, Evaluation, and Remedial Design.
431
Definitize Change Order 273, Accelerate TRU Repackaging
430
Incremental Funding
429
Issue CO 295, 200-IS1 OU Geological Interface Segmentation
428
Issue Change Order 294, 100-KR-4 RI/FS Re-write
427
Increase NTE for Change Order 276, Additional WESF Occupancy
426
Issue Change Order 293, 100-BC-5 RI-FS Decisional Re-Write
425
Issues Change Order 292, 200-SW-2 RI/FS WP Aerial Rad Survey
424
ARRA De-Obligation
423
Issues Change Order 291, 100-IS-1 WIDS Information
422
Increases the NTE cost authority for Change Order No. 266, 200-BP-5 Operable Unit Construction and Operation and Maintenance of Transfer Pipelines
421
Incremental Funding
420
Administrative Modification
419
Definitizes Change Order 268, Decommission of Cone Penetrometers and Soil Tubes at 1100-EM-1
418
This modification definitizes Change Order 290, Canister Storage Building Stack Monitoring
417
Issue Change Order 289, Transfer of River Corridor Closure Contract (RCCC) Work Scope to PRC
416
Revisions to Change Order Numbers 272, 282, 285 & 287.
415
Issues the following changer orders: 284, 285, 286, 287, & 288.
414
Issues the following changer orders: 273, 274, 275, 276, 277, 278, 279, 280, 281, 282, and 283.
413
Issues Change Order 271, “TPA Administrative Record Upgrade," and Change Order 272, “Build and Implement Portable Remediation Treatment.”
412
Issues Change Order 270, "PFP 243ZA Sump Pit Piping, Equipment and Tank(s) Removal and Disposal during Demolition."
411
Issues Change Order 269, "WESF K3 Ventilation and Stabilization Project Implementation."
410
Issues Change Order 268, "Decommission of Cone Penetrometers and Soil Tubes at 1100-EM-1
409
Incremental Funding
408
Definitize Change Order 262, Addition of Membrane Bio-Reactors at 200 West Pump and Treat.
407
Incremental Funding & Add FAR 52.203-99
406
Definitize Change Order 264, 200-UP-1 Uranium Treatment Inside 200 West Pump and Treat Facility
405
Definitize Change Order 261, Design and Construction of an Unloading Station and Transfer Tank at 200 West Pump and Treat to Support the 200-DV-1 Transient Perched Water Extraction System
404
Definitize Change Order 248, “Chronic Beryllium Disease Prevention Program Revision 2A Implementation”.
403
Definitize Change Order 240, PFP Chemical Lines
402
Update Section B and Attachment J.11
401
Incremental Funding
400
Incremental Funding
399
Incremental Funding
398
Incremental Funding
397
Supplemental Agreement, Section J, Attachment J.4
396
Incremental Funding
395
Issue CO 266, BP-5 Transfer Pipeline Construction and O&M
394
Definitize Change Order 260, 100-NR-2 Operable Unit Bioventing System
393
Incremental Funding
392
Definitize Change Order 259, Waste Encapsulation and Storage Facility Stabilization and Ventilation Project W-130 Preliminary and Final Design and Facility Preparation for Construction
391
Definitize Change Order 265, U.S. Ecology RI/FS
390
Definitize Change Order 252, Supplementary Characterization of UPR-100-K-1 and 116-KE-3 Wastesites, Phase II
389
Directive Update
388
Incremental Funding
387
Definitize REA 030 1655, titled “300 Area RI/FS and Proposed Plan
386
Definitize Change Order No. 258, titled “Integrated Disposal Facility Performance Assessment Scope Turnover Support"
384
Incremental Funding
383
Incremental Funding
382
Update Section J, Attachment J.4
381
NTE for CO 260
380
Incremental Funding
379
Definitize Change Order 256
378
Incremental Funding
377
Increase NTE for CO 240
376
Definitize Change Order No. 257, titled “Design, Install and Operations and Maintenance of Iodine Containment in 200-UP-1
375
Incremental Funding
374
Issue Change Order No. 264, titled “200-UP-1 Uranium Treatment inside 200 West Pump and Treatment Facility"
373
Attachment J.2 Revision
372
NTE for Change Order 262
371
Incremental Funding
370
Definitize Change Order 228
369
Issue Change Order 263
368
Definitize Change Order 249
367
Issue Change Order 262
366
Incremental Funding
365
Issue Change order 261
364
Definitize Change Order 253
363
Definitize Change Order 255
362
PEMP Revision and FY 15 Award Fee Plan
361
Key Personnel Changes – Section H
360
J-2 Update Hanford Emergency Management Plan Revision 6
359
Definitize Change Order 254
358
Update Section H.29 Responsible Corporate Official
357
Issue Change Order 260
356
Incremental Funding
355
Definitize Change Order 251
354
Definitize Change Order 250
353
Issue Change Order 259
352
Issue Change Order 258
351
Definitize Change Order 245
350
Revise Sections J.13 and J.14
349
Incremental Funding
348
Issue Change Order 257
347
Issue Change Order 256
346
Incremental Funding
345
Definitize Change Order 239
344
Definitize Change Order 247
343
Definitize Change Order 246
342
Definitize Change Order 242 and Add CRD 420.1C (Supp Rev 0)
341
Incremental Funding
340
Revise Section H for Conference Spending Clause
339
Revisions to Section J.2
338
Incremental Funding
337
Definitize CO 236
336
Funding De-obligation
335
Revision to Section H.11
334
Issue Change Order 255
333
Incremental Funding
332
Small Business Plan Annual Update
331
J.02 update
330
Issue Change Order 249
329
Definitize Change Order 238
328
Incremental Funding
327
Issue Change Order 254
326
Definitize CO 237
325
Option Period Performance Measures Table
324
Issue Change Order 253
323
Issue Change Order 252
322
Incremental Funding
321
Issue Change Order 228
320
Change Order 251
319
Change Order 250
318
Incremental Funding
317
Incremental Funding
316
Issue Change Order #245
315
Change order 227 definitization
314
Change Order 223 Definitization
313
Incorporation of Option Period PEMP and Administrative Revisions
312
Issue Change Order 248
311
Change Order 229 Definitization
310
Incremental Funding
309
Incremental Funding for RF2047
308
Change Order 222 Definitization
307
Issue Directed Change 239
306
Incremental Funding
305
Change Order 247
304
Incremental Funding and Removal of Subparagraph "f" of Clause B.2
303
Change Order 246
302
Revisions to Sections C, I, J.2 and J.15
300
Incremental Funding and Section B Revision
299
Definitization of Change Orders 299 and 232
298
Incremental Funding
297
Incremental Funding-Deobligation
296
Change Order 240 and Incremental Funding
295
Change Order 238, 100-NR-2 Aquifer Barrier Expansion
294
Incremental Funding
293
Exercise Option Period
292
Administrative Change
291
Incremental Funding De-Ob
290
Supplemental Agreement for CLIN VII
289
Incremental Funding for Base and RFS
288
Incremental Funding
287
Change Order 240 and Incremental Funding
286
Definitization of Change Orders 193, 195 and 206
285
Incremental Funding
284
Incremental RFS Funding and Closeout
283
This modification makes the following revisions: Change Order 222: In accordance with FAR 52.243-2, Applicable changes to Contract Table B.4-3, This modification does not provide additional funds for Change Order 222.
282
Revised Delivery Schedule for Contract Deliverable C.3.2.4-5
281
Change Order 223
280
Change Order 227 and Table B administrative updates
279
Change Order #229 – Vadose Zone Barrier
278
Issue Change Order 232 for Actions Required by EPA CAFO
277
Summary heading for the modification is "Incremental Funding for Base and RFS
276
Issue and Definitize Change Order 230 for DOE O 206.2
275
Incremental Funding
274
Incremental Funding
273
Issue Change Order 195
272
Change Orders 202 and 221 Definitization
271
Incremental Funding and Updates to Sections B (Contract Value) and J.4 (PEMP)
270
Incremental Base Funding
269
Revisions to Sections H and J.8
268
Change Order 222 BC-5 work continuation
267
Incremental Funding
266
RFS Funding for PSNS
265
Incremental Funding and RFS
264
Incremental Funding and RFS
263
Incremental Funding and RFS
262
Incremental Base Funding
261
Scope Transfers for RL-40
260
Funding Adjustments
259
Change Order 221
258
RFS Funding for PSNS
257
J-06 and J-07 Small Business updates
256
Change Order 186 Definitization
255
Change Order 220, J.3 update
254
Incremental Funding
253
Performance Evaluation and Measurement Plan Revision 4
252
Section J.2 and I update; Change Orders 203, 204, 205, 196 and 197
251
Definitize Change Order 001
250
Incremental Funding and Funding Adjustments
249
Annual Update for Contract and Baseline Alignment
248
J.4 Administrative Change
247
Incremental Funding and IEWO Authorization
246
Revision to Section J.3, Interface # 32
245
Section H.15, Key Personnel Update
244
RFS and Incremental Funding
243
RFS and Incremental Funding
242
Incremental Funding and Funding Adjustments
241
Revisions to Attachments J.13 and J.14
240
Incremental Funding
239
Definitize Change Orders 067, 113 and 174
238
Incremental Funding
237
RFS Funding and Update to Contract Section B.15
236
Administrative Changes
235
Incremental Funding and Update to Contract Table B.4-1 and B.4-2
234
Multiple Change Order Definitization and Updates to Sections C, I and J.2
233
Change Order 174 Administrative Change NTE increase amount
232
Change Order 155 and Change Order 180 Definitization
231
Incremental Funding and Funding Adjustments
230
Admin Mod – Section B Merge Mod 227 and 228
229
Summary heading for the modification is "Funding Adjustments
228
Deobligation Funding
227
Administrative Changes
226
J-10, Wage Determination update
225
Definitize Change Orders 184, 185, 187 and other Administrative Changes
224
Definitization of Change Order 173
223
Funding Adjustments
222
Section J.3 Revisions
221
Incremental Base Funding
220
Contract Price update
219
Base Funding Adjustments
218
Revision to H.15, Key Personnel
217
Incremental Base Funding Adjustments
216
Incremental Funding
215
Change Order 174 Steam Pipe Landlord Assignment
214
Funding Modification
213
Admin Correction to Mod 212
212
Admin Correction to Mod 210
211
Administrative change – Foreign Travel Reporting
210
Incremental Funding
209
Incremental Base Funding and Net Zero Changes
208
Incremental Base Funding
207
ARRA Re-Opener Release
206
Definitize Change Orders 9 and 72 and Issue Change Order 180
205
Change Orders 181, 182, 183 and J-3, J-13, J-14 updates
204
Base Funding De-Obligation
203
Revisions to Sections H and J.2
202
Incremental Base Funding and Funding Adjustments
201
Change Order 104 Definitization
200
Definitize Change Orders 172, 175, 176 and other administrative changes
199
Definitizes Change Orders 159, 166, 171 and 175 and Administrative Changes
198
Change Order 172
197
Revisions to Services and to Section F.1, Period of Performance
196
Incremental Funding
195
Deobligation of Funding
194
Funding and Change Order 173
193
Wage Determination Update
192
PEMP and B.4 Table Update
191
Contract Funding Revisions
190
Contract Funding Revisions
189
RFS Funding De-Obligation and CO 72 Revision
188
Contract Section J.2 Revision and CO 125 Definitization
187
CO 139 Definitization
186
Incremental Base Funding
185
Funding Adjustments
184
Change Order 111 Revision, Base to ARRA Change and Funding Adjustments
183
Revisions to Section J.2
182
Definitize Change Order 107 200-UP-1 S/SX
181
Incremental Base Funding and Misc Corrections
180
Small Business Plan Incorporation – J.6, J.7 updates
179
Contract Section J.3 Revision
178
Key Personnel Changes
177
Definitization of Change Orders 90, 101 and 135
176
Revisions to Contract Sections J.9
175
Change Order 069 Definitization
174
Change Order 090 and administrative change 6625L facility
173
Issue Change Order 103 and 104
172
Change Order 115 and 116 Definitization
171
Incremental Base Funding and ARRA to Base Reassignment
170
Revisions to Sections I and J.2; Change Order Definitization
169
Contract Section J.2 Revision
168
Revise ARRA Performance Period
167
Incremental Funding and Funding Revisions
166
Revised NTE amount for Change Order 107
165
Change Orders 089, 119, 122 and 123 Definitization
164
Contract Section B.15, Other Costs and Projects
163
Incremental Funding and Revisions
162
Change Order Definitization
161
Revisions to Contract Sections J.13 and J.14
160
Section C Revision and Waste Site Transfer
159
Revisions to Change Orders 69, 83 and 139
158
Change Order Definitization and Section J.2 Revision
157
Incremental Funding
156
Key Personnel Change and Responsible Corp Official Update
155
Change Order 139 and Incremental Funding
154
Change Order 36 Definitization
153
Funding Adjustments
152
Change Order Definitization
151
Incremental Base Funding and Limitation of Liability Update
150
Change Orders 73, 89 and 135
149
Change Orders and Revisions
148
Change Order 85, 105, 117, 118 and 131 Definitization
147
Incremental Base Funding and Admin Changes
146
Modification number not utilized
145
Section I and Section H Revisions
144
Change Order 114, Revision to Change Order 101 and Administrative Changes
143
Definitization of Change Order 74
142
Limited Notice to Proceed, Change Order #72
141
Change Order 17 Definitization
140
Change Orders 122, 123, revisions to Mod 135 and administrative changes
139
Change Order 110, 111 and Incremental Funding
138
Change Order 119 and Limitations of Liability Revisions
137
Definitization of Change Orders 76, 84, 99 and 109
136
Incremental Base Funding
135
Change Orders 115 and 116 and Administrative Changes
134
Incremental Base Funding
133
Administrative Changes
132
Issue Change Orders 107 and 108; Revise Change Orders 009, 069.
131
Section J.3 Revision
130
PFP material differences
129
Change Order No. 101 and Incremental Funding
128
Change Order 105
127
Revision of Change Order 83
126
Administrative Changes to ARRA Funding
125
Deffinitization of ARRA Funds
124
Change Order 92 and Funding
123
Change Order and Contract Section B.2.(d)(4) Update
122
Incremental Base Funding and Correction to Mod 120
121
Change Order 83, Beryllium Program Interim Actions
120
Change Order #86 Change in condition for MG-1 Operable Unit Waste Sites 600-222, 600-38, and 600-36 American Recovery and Reinvestment Act work scope - #87 Change in condition for Operable Unit (OU) Cooling Water-3, Site 216-N-4 Remediation American Recovery and Reinvestment Act work scope
119
Change Order #84 R&D Quarterly Report and Groundwater Plan
118
Change Order #69 WESF Ventilation Upgrades
117
Table B.4-1 Revision
116
Update to H.15, Key Personnel
115
Funds Obligation – Increase to Base Funds - $23,800,000.00
114
ARRA Increase Obligation Funds $111,414,000.00
113
Modification number not utilized
112
Change Order #73 Background Calculations and #74 High Air Flow Testing
111
Section J.4 Revision
110
Section J.13 and J.14 Revisions
109
PARS II Reporting Requirements into the SOW
108
Definitizes ARRA Change Orders
107
ARRA Funds Deobligation - Apportionment Change
106
Update to Contract Clause I.24-A, FAR 52-216-24, Limitation of Government Liability
105
Definitize Change Orders 8, 24, 78, 80, 81, 82, 88, 91, 100 and 106.
104
Change Order Definitization and Contract Section J.2 Update"
103
Incremental Base Funds
102
FAR 52.216-24 Limitation of Government Liability
101
Funds Obligation – Increase to Base Funds - $16,205,922.33
100
Incremental funding change
099
Modification of Change Order #39
098
100-K ARRA to Base switch
097
Change Order No. 28 Definitization – FAR 52.222-54, Employment Eligibility Verification
096
Updates Section J, J.2
095
Change Order #54 – Implementation of Tri-Party Agreement Changes
094
ARRA Funding Deobligation – ($136,000.00)
093
Base Funding Obligation - $37,768,106.20
092
Modification number not utilized
091
Transfer Demolition and Disposition Activities for 2736Z/ZB, 242-Z, and the Balance of 234-5Z Facilities from CLIN 2 (Base) to CLIN 6 (Recovery Act)
090
ARRA Funds deob - apportionment change
089
Incremental Base Funding Obligation - $84,700,000.00
088
ARRA Funds deob-ATL
087
Definitize Change Order 15 - Recovery Act
086
Incremental Base Funding
085
Definitize Change Order 13 - Quarterly OCRWM QA Report
084
Definitize Change Order 4 - DOE O 5660
083
Incremental Base Funding
082
ARRA Funds deob-ATL
081
50 percent funding authorization
080
Change Order #18 – Liquid Waste Treatment and Disposal
079
Incremental Funding
078
PMIS Implementation
077
Change Order #28, Revising Section I to incorporate FAR 52.222-54, Employment Eligibility Verification
076
Incremental Funding
075
Change Order #17, Office of Civilian Radioactive Waste Management Records Consolidation
074
Incremental Funding
073
Incorporation of Performance Evaluation and Measurement Plan, Revision 1
072
Incremental Recovery Act Funding
071
Incremental Funding
070
Incremental Recovery Act Funding
069
Incremental Funding
068
Revisions to Change Order #15, American Recovery and Reinvestment Act work activities
067
Incremental Funding
066
Key Personnel Change
065
Misc update C H J.2
064
Incremental Recovery Act Funding
063
Incremental Recovery Act Funding
062
Incremental Funding
061
Definitize Change Order 2&3
060
Definitize CO-11 Industrial 7 and 272W
059
Incorporation of Performance Evaluation and Measurement Plan
058
Obligation and Availability of Funds (Recovery Act)
057
Incremental Funding
056
Change Order #21, Revising Attachments J.13, Hanford Site Structures List, and J.14, Hanford Waste Site Assignment List
055
Incremental Funding
M054
Change Order #20, Revising Attachment J.2, Requirements Sources and Implementing Documents
A053
Incremental Funding
M052
Number not used due to software system change
M051
Number not used due to software system change
M050
Definitization of Change Order #5, Removal of Government Furnished Equipment
A049
Funding classification change
A048
Incremental Funding
M047
Revisions to Change Order #15, American Recovery and Reinvestment Act terms and conditions
M046
Modification to Clause H.17, Stop Work and Shutdown Authorization
A045
Incremental Funding
A044
Incremental Funding
M043
Incorporation of Attachment J.8, Advance Understanding
A042
Funding classification changes
A041
Incremental Funding
A040
Incremental Funding
A039
Incremental Funding
A038
Incremental Funding
A037
Change Order #15, American Recovery and Reinvestment Act authorization and funding
A036
Incremental Funding
A035
Incremental Funding
M034
Change Order # 14 Revising Section C, Subsection C.2.3.7, Waste Retrieval
A033
Incremental Funding
A032
Incremental Funding
A031
Incremental Funding
M030
Definitization of Change Order #7, Changes to Attachment J.2, Requirements Sources and Implementing Documents
M029
Change Order #6 - Unilateral Determination
M028
Miscellaneous clause updates and correction of Table B.4-1
M027
Change Order #13, Revising Section C.3.2.4, Quality
M026
Changes to Section C.5, Summary of Contract Deliverables
A025
Incremental Funding
A024
Incremental Funding
M023
Modification to Clause B-3, Obligation and Availability of Funds
M022
Change Order #11 Revising Attachment J.13 for 272W Facility
A021
Incremental Funding
M020
Changes to Attachment J.12, Government Furnished Services and Information (GFS/I)
A019
Incremental Funding
A018
Incremental Funding
M017
Change Order #9, Revising Section C.2.7, 100 K Area
M016
Change Order #10, Revising Section C.2.3.6.1, Transuranic Waste Certification
A015
Incremental Funding
M014
Change Order #8, Revising Attachment J.2, Requirements Sources and Implementing Documents
M013
Change Order #6, Direction to provide facility access to another federal agency
M012
Change Order #5, Removal of government-furnished equipment for loan to National TRU Program
M011
Change Order #4 Revising Attachment J.2, Requirements Sources and Implementing Documents
M010
Modification of Change Order #2, Revising Attachment J.13, Hanford Site Structures List
A009
Incremental Funding
A008
Incremental Funding
A007
Incremental Funding
A006
Incremental Funding and Modification of Change Order #3, facility designation
M005
Change Order #3, Revising Attachments J.13, Hanford Site Structures List, and J.14, Hanford Waste Site Assignment List
M004
Change Order #2, Revising Attachments J.13, Hanford Site Structures List, and J.14, Hanford Waste Site Assignment List
M003
Incorporation of Attachment J.9 Special Financial Institution Account Agreement
M002
Incorporation of Attachment J.15, Agreement for Subcontractors to Participate in the Hanford Site Benefit Plans
A001
Change Order #1, Issuing Notice to Proceed and associated changes to transition period and deliverables, obligation of funds, and Nuclear Safety changes.