Newsroom

Popular Keywords: 209-E Critical Mass Laboratory Demolition


 
>209-E Critical Mass Laboratory Demolition > CHPRC-0900540.92 Attachment 1 Photo 10 209-E tanks size reduction 7-15-11.JPG

Gallery: 209-E Critical Mass Laboratory Demolition
Title: 209-E Critical Mass Laboratory Demolition
209-E Critical Mass Laboratory Demolition
Name: 209-E Critical Mass Laboratory Demolition
Document Date: 01/01/2011
Keywords: 209-E, 209E, Critical Mass Laboratory, demolition, central plateau, ch2m hill
Official Building Numbers: 209-E
Area: 200 East
Description:
CH2M HILL workers use a ”shroud” they developed with safety personnel to cut up a long, flat tank, known as a slab tank, in the 209-E Critical Mass Laboratory. The shroud envelops cutting operations in a negative-air pressure environment, so contaminated residue inside the tank doesn’t become airborne.