Title: Glove Box Decontamination
Glove Box Decontamination
Name: Glove Box Decontamination
Document Date: 11/13/2009
Keywords: CHPRC, Plutonium Finishing Plant, Glove box, 11.13.09
Area: Plutonium Finishing Plant
Description:
A nuclear chemical operator loads a package of decontamination supplies into glove box HC-60 at the Plutonium Finishing Plant. The package is loaded into an air-locked “load-in” port that provides a seal between the clean and the contaminated air as the package enters the glove box. After decontamination is finished, the package will become part of the waste that will later be removed from the glove box.