Newsroom



 
>American Recovery and Reinvestment Act > CHPRC-0900540.8 Attachment 1 Photo 15.jpg

Gallery: American Recovery and Reinvestment Act
Title: 183 KW Aerial
183 KW Aerial
Name: 183 KW Aerial
Document Date: 10/30/2009
Keywords: 100-K Area, chemical, asbestos, demolition, mixing, basin, characterization, Recovery Act, removed, Soil remediation, groundwater, 10.30.09
Description:
Aerial view of the 183KW complex. The chemical storage silo and headhouse (top) await asbestos removal prior to demolition. The chemical mixing inlets (upper middle), sedimentation basins (middle,) and outlet filters (bottom) await final characterization to determine the extent of structure demolition required. The white rectangular area (top right) is the Chlorine Vault Building Slab, which was removed with Recovery Act funding earlier this year after this photograph was taken. Removal of all of these structures will provide access for soil and groundwater remediation efforts.