Vadose Zone Characterization Project at the Hanford Tank Farms
Addendum to the A Tank Farm Report
September 2000
Prepared for U.S. Department of Energy, Richland Operations
Office, Richland, Washington.
Prepared by U.S. Department of Energy, Grand Junction
Office, Grand Junction, Colorado.
Work Performed Under DOE Contract No. DE-AC04-94AL96907 for the U.S. Department of Energy.
Table of Contents
Signature Page
Executive Summary
1.0 Introduction
2.0 Summary of Additional Data
3.0 Discussion of Results
4.0 Three-Dimensional Visualizations
5.0 Conclusions
6.0 Recommendations
7.0 References
Appendix A. Summary of High Rate Logging Results
for the A Tank Farm
Appendix B. Summary of Repeat Logging Results
for the A Tank Farm
Appendix C. Summary of Interpreted Data Set
for the A Tank Farm
Appendix D. A Tank Farm Visualizations