Vadose Zone Characterization Project at the Hanford Tank Farms, BY Tank Farm Addendum
DOE Grand Junction Office, Grand Junction, Colorado

 
GJO-96-2-TARA
GJO-HAN-6

 
 

Vadose Zone Characterization Project at the Hanford Tank Farms

Addendum to the BY Tank Farm Report
 

September 2000
 

Prepared for U.S. Department of Energy, Office of River Protection, Richland, Washington.
Prepared by U.S. Department of Energy, Grand Junction Office, Grand Junction, Colorado.

Work Performed Under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy.



Table of Contents

Signature Page
Executive Summary
1.0  Introduction
2.0  Summary of Additional Data
3.0  Discussion of Results
4.0  Three-Dimensional Visualizations
5.0  Conclusions
6.0  Recommendations
7.0  References
Appendix A. Additional Borehole Data for the BY Tank Farm
Appendix B. Summary of High Rate Logging Results for the BY Tank Farm
Appendix C. Summary of Repeat Logging Results for the BY Tank Farm
Appendix D. Summary of Interpreted Data Set for the BY Tank Farm
Appendix E. BY Tank Farm Visualizations