This section contains reports and documents prepared by the Groundwater
Remediation Project from July 2002 through present, as well as documents
closely related to the work of the Groundwater Remediation Project.
| Title |
Issue Date |
Rev. |
Document # & File Size |
| Groundwater Performance Metrics FY2007 |
July 2008 |
0 |
Introduction
2 MB
100-BC-5
1226 kb
100-HR-3-D
1852 kb
100-FR-3
1156 kb
100-H-3-H
1629 kb
100-KR-4
2158 kb
100-NR-2
1460 kb
200-BP--5
2525 kb
200-PO-1
1341 kb
200-UP-1
2470 kb
200-ZP-1
1332 kb
300-FF-5
1757 kb
1100-EM--1
1361 kb
|
100-NR-2 Apatite Treatability Test:
Low-Concentration Calcium-Citrate-Phosphate Solution Injection for In Situ Strontium-90 Immobilization |
July 2008 |
0 |
PNNL-17429
11.3 MB
|
| Deep Vadose Zone Treatability Test Plan for the Hanford Central Plateau, DOE-RL-2007-56 |
March 2008 |
0 |
DOE-RL-2007-56
3.2 MB
|
| Hanford Integrated Working Schedule-Second Quarter FY 2008 |
Feb. 2008 |
0 |
100-BC-5
93 kb
100-D
130 kb
100-FR-#
91 kb
100-H
91 kb
100-K
92 kb
100-NR-2
130 kb
300-FF-5
93 kb
200-BP-5
132 kb
200-PO-1
133 kb
200-UP-1
131 kb
200-ZP-1
130 kb
|
| Common Requirements of the Format for Electronic Analytical Data (FEAD) |
Dec. 2007 |
8 |
CP-15383
1.3 MB |
| Hanford Integrated Groundwater and Vadose Zone Management Plan, DOE/RL-2007-20 |
Oct. 2007 |
0 |
DOE/RL-2007-20
12.2 MB
|
| Fiscal Year 2006 Annual Summary Report for the In Situ Redox Manipulation Operations |
July 2007 |
0 |
DOE/RL-2007-19
19.92 MB |
| Calendar Year 2006 Annual Summary Report for the 100-HR-3, 100-KR-4, and 100-NR-2 Operations |
May 2007 |
0 |
DOE/RL-2006-76 Part 1
48 MB
DOE/RL-2006-76 Part 2
16 MB
DOE/RL-2006-76 Part 3
31 MB
|
Strontium-90 Treatability Test Plan for 100-NR-2 Groundwater OU |
May 2006 |
0 |
DOE/RL-2005-96
ARPIR Site |
| Treatability Test Plan for Using Purolite Resin to Remove TC-99 from 200-ZP-1 Groundwater |
May 2006 |
0 |
DOE/RL-2006-64
1.04 MB |
Remedial Investigation Report for 200-ZP-1 Groundwater OU |
April 2006 |
A |
DOE/RL-2006-24
ARPIR Site |
| Treatability Test Report for Calcium Polysulfide in the 100K
Area |
Feb. 2006 |
0 |
DOE/RL-2006-17
9.05 MB |
| Performance Objectives for Tank Farm Closure Performance Assessments |
Sept. 2005 |
2 |
RPP-14283
4.09 MB |
Remedial Investigation Feasibility Study Work Plan For 200-UP-1 Groundwater OU |
April 2005 |
1 |
DOE/RL-92-76
ARPIR Site |
Sampling and Analysis Plan For In-Situ Redox Manipulation Project |
Sept. 2004 |
0 |
DOE/RL-2003-63
ARPIR Site |
Remedial Investigation Feasibility Study Work Plan for 200-ZP-1 Groundwater OU |
Aug. 2004 |
0 |
DOE/RL-2003-55
ARPIR Site |
| Hanford Site Risk-Based End State Vision |
April 2004 |
- |
DOE/RL-2003-59
website |
Hanford Site Groundwater Strategy - Protection, Monitoring,
and Remediation |
Feb. 2004 |
0 |
DOE/RL-2002-59
1.21 MB
Comment
& Response Record
717 K |
| Contents of Long-Term Performance Analyses to Support the Retrieval and Closure
of Tanks for the Washington State Department of Ecology |
Jan. 2004 |
1 |
RPP-14284
2.05 MB |
| Characterization of Vadose Zone Sediment: RCRA Borehole 299-E33-338
Located Near the B-BX-BY Waste Management Area |
June 2003 |
0 |
PNNL-14121
5.92 MB |
| Contents of Risk Assessment to Support the Retrieval and Closure of Tanks for the
Washington State Department of Ecology |
March 2003 |
0 |
RPP-14824
83 K |
| Hanford's Groundwater Management Plan: Accelerated Cleanup and Protection |
March 2003 |
0 |
DOE/RL-2002-68
9.54 MB |
| Performance Objectives for Tank Farm Closure Risk Assessments |
March 2003 |
0 |
RPP-14283
542 K |
| Characterization of Vadose Zone
Sediment: Borehole 299-E33-46
Near B 110 in the B BX-BY Waste
Management Area |
Dec. 2002 |
0 |
PNNL-14119
varies |
| Characterization of Vadose Zone Sediment: Borehole 299-E33-45
Near BX-102 in the B-BX-BY Waste Management Area |
Dec. 2002 |
0 |
PNNL-14083
varies |
| Field Investigation Report for Waste Management Area B-BX-BY |
Dec. 2002 |
0 |
RPP-10098
Vol. 1
6.34 MB
Vol. 2
8.33 MB |
| Geochemical Factors Affecting the
Behavior of Antimony, Cobalt,
Europium, Technetium, and Uranium in
Vadose Sediments |
Dec. 2002 |
0 |
PNNL-14126
1.17 MB |
| Cleanup, Constraints, and Challenges (C3T) Team Status Interim Report |
Nov. 2002 |
0 |
DOE/RL-2002-65
varies |
| Groundwater Protection Program Science & Technology Summary Description |
Nov. 2002 |
2 |
PNNL-14092
808 K |
| Initial Assessment of Hanford Impact Performed with the System Assessment Capability |
Sept. 2002 |
0 |
PNNL-10427
varies |
| Field Investigation Report for Waste Management Area S-SX |
Jan. 2002 |
0 |
RPP-7884
Vol. 1
5.04 MB
Vol. 2
15.0 MB |