- Bechtel National, Inc. (BNI) - Design, construction, and commissioning of the Hanford Tank Waste Treatment and Immobilization Plant
- BNI Contract (current through Mod 311)
- BNI Contract Modifications (current through Mod 311)
- Performance Measurement Plans
- Award Fee Determination/2013-A (January 1 – June 30, 2013) (PDF)
- Advanced Technologies and Laboratories(ATL) - 222-S Laboratories
- Original Contract
- ATL Contract (current through Mod 095)
- ATL Contract Modifications (current through Mod 095)
- Washington River Protection Solutions LLC (WRPS) - Tank Operations Contract
- Original Contract
- WRPS Contract (current through Mod 216)
- WRPS Contract Modifications (current through Mod 229)
- Partnering Agreement
- Award Fee Determination Scorecard (October 1, 2011 to September 30, 2012)
- CH2M HILL Hanford Group, Inc. (CH2M) - Tank Farm Management Contract
- CH2M Contract (current through Mod A174)
- CH2M Contract Modifications (current through Mod A174)
- CH2M Original Contract
Disclaimer: All contract documents on this website are electronic copies, not originals. Accordingly, none of the contract documents on this website are official contract documents, and should be regarded only as reference materials. The signed original version of the contract, and all modifications thereto, are located in the Office of River Protection, Acquisition Management Division.



