| Amendment of Solicitation/Modification of Contract | DE-AC06-96RL13200
Modification M052 |
Below is a summary of additions, changes, and deletions to Performance Objectives, Measures, Expectations and Incentives as a result of this contract modification. Refer to the Table on pages 3 through 54 for specific changes:
1) Additions: SNF1.1.8, SNF1.5.2,
2) Changes to Existing: CFO3.1.1, FS2.1.2, FS5.4.1, FS7.1.1, FS10.1.1A, SNF1.1.3, SNF1.2.2, SNF1.2.3, SNF1.4.1, SNF1.5.1, TWR1.1, TWR1.1.3, TWR1.2.2, TWR1.2.12, TWR1.4.3, , TWR3.2.2, WM4.1.2, WM6.1.1
3) Canceled: SNF1.1.4
Section J, Appendix H, page J-H-3 is changed as follows:
1) Paragraph 2.: the Measure fee is changed from 4.75% to 5.35%; the Expectation fee is changed from 86.75% to 86.15%.
Continue to next section