DE-AC06-96RL13200 Modification M056 |
| OFFICE OF THE MANAGER | ||||
| OBJECTIVE | MEASURE | EXPECTATION | INCREASED | NEGATIVE |
| MGR 1: Reduce project direct costs.
0.00% at Objective Level |
MGR 1.1: Reduce Tank Waste Remediation System, Waste
Management, Spent Nuclear Fuel, and Facility Stabilization project
direct costs.
0.00% at Measure Level |
MGR 1.1.1:Reduce project direct costs by $21.2M in FY
1998. Project direct cost savings may come from any of the following
projects: Tank Waste Remediation System, Waste Management, Spent Nuclear
Fuel, and Facility Stabilization.
70 percent of the incentive fee available for this PA can be earned by the Contractor for meeting the Performance Expectation. If less than $21.2M is saved, the Contractor may earn a portion of the 70 percent as identified in Section 5, Table 1. 4.75% at Expectation Level |
85 percent of the incentive fee available for this PA
can be earned by the Contractor if the Performance Expectation is met
and a total of net project direct cost savings exceeds $23.85M in FY
1998; and
100 percent of the incentive fee available for this PA can be earned by the Contractor if the Performance Expectation is met and the total of net project direct cost savings exceeds $26.50M in FY 1998. |
N/A |
| N/A | N/A | MEGA INCENTIVE: The DOE Performance Expectation Plan for FDH Company Performance During the Twelve-Month Evaluation Period, Ending September 30, 1998, establishes the bases to measure performance under this PA. | N/A | N/A |