DOE-RL DE-AC06-96RL13200
Modification M056

OFFICE OF THE MANAGER
OBJECTIVE MEASURE EXPECTATION INCREASED NEGATIVE
MGR 1: Reduce project direct costs.

0.00% at Objective Level

MGR 1.1: Reduce Tank Waste Remediation System, Waste Management, Spent Nuclear Fuel, and Facility Stabilization project direct costs.

0.00% at Measure Level

MGR 1.1.1:Reduce project direct costs by $21.2M in FY 1998. Project direct cost savings may come from any of the following projects: Tank Waste Remediation System, Waste Management, Spent Nuclear Fuel, and Facility Stabilization.

70 percent of the incentive fee available for this PA can be earned by the Contractor for meeting the Performance Expectation.

If less than $21.2M is saved, the Contractor may earn a portion of the 70 percent as identified in Section 5, Table 1.

4.75% at Expectation Level

85 percent of the incentive fee available for this PA can be earned by the Contractor if the Performance Expectation is met and a total of net project direct cost savings exceeds $23.85M in FY 1998; and

100 percent of the incentive fee available for this PA can be earned by the Contractor if the Performance Expectation is met and the total of net project direct cost savings exceeds $26.50M in FY 1998.

N/A
N/A N/A MEGA INCENTIVE: The DOE Performance Expectation Plan for FDH Company Performance During the Twelve-Month Evaluation Period, Ending September 30, 1998, establishes the bases to measure performance under this PA. N/A N/A