Amendment of Solicitation/Modification of Contract DE-AC06-96RL13200
Modification M070

B.3 PERIOD OF PERFORMANCE

The period of performance for the work specified in Section C of this contract shall commence on the date of award of the contract, and continue through September 30, 2001, unless terminated sooner as provided for in other provisions of this contract. The Transition Period shall commence on the date of award of the contract and continue through September 30, 1996.

B.4 ESTIMATED COST AND FEE

  1. The estimated cost and total available fee pool will be established annually by the Government and set forth in a modification to this subsection. The estimated cost excludes costs of work related to Bechtel Hanford, Inc. (BHI), Hanford Environmental Health Foundation (HEHF), privatization of treatment of Tank Waste Remediation System (TWRS) work and Pacific Northwest National Laboratory [non-Environmental Management (EM)] work. The total available fee pool will be based on the fee proposed and negotiated at the time of contract award. The estimated cost (includes total available fee pool) for this contract is as follows:

Table B-1
Estimated Costs (in millions)(1)(2)

CATEGORY FY 1997 FY 1998 FY 1999 FY 2000 FY 2001(3)
EM Non-Construction
EM Construction
776.3
151.4
735.5
61.0
740.6
124.0
695.7
158.0
634.5
196.0
Total EM 927.7 796.5 864.6 853.7 830.5
Other Non-Const.
Other Construct.
98.8
0.0
65.0
0.0
106.0
0.0
106.0
0.0
106.0
0.0
Total Other 98.8 65.0 106.0 106.0 106.0
Total Site Funding 1026.5 862.5 970.6 959.7 936.5
Total Avail. Fee Pool 54.0 44.6 50.0 49.5 48.3

Hanford Home Page | Mod List | M070 Index

For questions or comments, please send email to Alan_E_Hopko@rl.gov
Document Number: DE-AC06-96RL13200
Mod: M070