List associated performance objectives, measures, and
performance expectations for FY00, FY01 & FY02. Identify
associated PBS # for each performance objective and/or measures as
appropriate.
Performance Objective: Retrieve and Ship TRU Offsite PBS
RL WM04
Measure 1 - # of drums retrieved
| Expectation(s) |
Regular |
Stretch |
| FY00 |
unfunded |
at least 400 |
| FY01 |
unfunded |
N/A |
| FY02 |
unfunded |
N/A |
| FY01 to completion |
35,416 |
N/A |
Measure 2 - # of shipments to Waste Isolation Pilot Plant
(WIPP)
2.a. Complete draft TRU PMP (Support IAW TPA Milestone M91-03)
| Expectation(s) |
Regular |
Stretch |
| FY00 |
unfunded |
6/30/00 |
2.b. Effective # of TRU waste containers processed
| Expectation(s) |
Regular |
Stretch |
| FY00 |
500 |
N/A |
| FY01 |
TBD |
N/A |
| FY02 |
TBD |
N/A |
| FY03 to completion |
77,091 |
N/A |
2.c. # of shipments to WIPP
| Expectation(s) |
Regular |
Stretch |
| FY00 |
at least 8 |
N/A |
| FY01 |
at least 12 |
N/A |
| FY02 |
at least 12 |
N/A |
| FY03 to completion |
1,894 |
N/A |
|
|
Identify fee schedule by performance objective and/or measure(s)
Stretch = 30% of the fee available for this Performance
Incentive
Measure 1 - 20% of the fee available for this Performance
Incentive
Measure 2 -
Expectation 2.a - 10% of the fee available for this
Performance Incentive
Regular = 70% of the fee available for this Performance
Incentive
Measure 2 -
Expectation 2.b - 17.5% of the fee available for this
Performance Incentive for at least 400 "effective"
containers or 35% of the fee available for this Performance
Incentive for at least 500 "effective" container
Expectation 2.c - 17.5% of the fee available for this
Performance Incentive for at least 6 shipments or 35% of the fee
available for this Performance Incentive for at least 8 shipments
Note: Fiscal Year 01 to completion is provided for
future planning purposes only. No fee is assigned to these items in
FY00. |
|
PREVIOUS YEARS GATEWAY Describe previous years
gateway (if applicable) that must be completed before fee can be paid
under this performance measure. The requirements listed below are the
gateway only requirements for this Performance Measure. (N/A in FY
2000)
GENERAL REQUIREMENTS: In order to earn incentive fee under
this Performance Incentive, the Contractor shall:
- meet the specific completion criteria and expectations set forth
in this Performance incentive; and
- not incur any unfavorable cost variance [(BCWP-ACWP)/BCWP]
greater than 5.0 Percent, or incur any unfavorable schedule
variance [(BCWP-BCWS/BCWS] greater than 7.5 percent, measured at the
Project Baseline Summary level at the end of FY 2000.
DEFINE COMPLETION: (Specify Performance Elements and
describe indicators of success (quality/progress). Include baseline
documentation/data against which completion documentation should be
compared).
| Measure 1 - |
In support of TPA Milestones M-91-04/07, the contractor shall
complete the retrieval of a minimum of 400 suspect-TRU drums from
the Low-Level Burial Grounds by September 30, 2000. |
| Measure 2 |
|
|
Expectation 2.a - To support meeting the requirements of
TPA Milestone M-91-03, the contractor shall complete a draft final
Hanford Site TRU/TRUM Project Management Plan (PMP) by May 22,
2000. The PMP shall be prepared in accordance with the
requirements of TPA Action Plan Section 11.5. |
|
Expectation 2.b - The Contractor shall complete
processing a minimum of 500 "effective" TRU waste
containers by September 30, 2000. |
|
Expectation 2.c - The Contractor shall complete a
minimum of eight TRU shipments to WIPP by September 30, 2000. |
DEFINITIONS: (define terms)
| LLW |
Low Level Waste |
| TRU |
Transuranic Waste |
| TRUM |
Transuranic Mixed Waste |
| TRUPACT-II |
Shipping Container |
| Measure 1 - |
Retrieval will include removing the drum from the stack,
assaying the drum, and assigning a new designation (i.e. LLW or
TRU). |
| Measure 2 |
|
|
Expectation 2.a None |
|
Expectation 2.b -
- TRU waste container processing is defined as containers
processed in accordance with the Hanford Site Quality Assurance
Project Plan (QAPjP) and the Hanford Site TRU Waste
Certification Plan (Cert. Plan).
- Processing one "effective" TRU waste container is
defined as completing Non Destructive Examination (NDE), Non
Destructive Assay (NDA), and Headspace Gas Analysis activities.
Completion of any one activity equals 0.33 "effective"
TRU waste containers processed. (This allows for processing
efficiency based upon project needs for certification and
shipment of TRU containers.)
|
|
Expectation 2.c - A shipment is defined as a Contractor
certified payload of TRU waste containers leaving the Hanford Site
utilizing the TRUPACT-II shipping containers. |
COMPLETION DOCUMENTS LIST: (In addition to the
Completion Notice the document(s) that should be submitted/data that
should be available/actions to be taken by evaluator, to determine
actual performance to the requirements stated above).
| Measure 1 - |
The contractor shall submit a letter report to RL by October 20,
2000, documenting the number of drums retrieved by their
associated package identification number (PIN) and the disposition
of the drums. |
| Measure 2 |
|
|
Expectation 2.a - The contractor shall submit to RL, by
May 22, 2000, a final draft of the TRU/TRUM PMP in accordance with
the requirements in TPA Action Plan Section 11.5. |
|
Expectation 2.b - The contractor shall provide a letter
report to RL by October 20, 2000, documenting the quantity of "effective"
TRU waste containers processed by Container Identification Number
(CIN) and each associated process activity completed during FY
2000. |
|
Expectation 2.c - The contractor shall submit a letter
report to RL by October 20, 2000, documenting the number of
shipments completed. |
ASSUMPTIONS/TECHNICAL BOUNDARY CONDITIONS AND REMEDY STATED:
(For reasonably foreseeable impacts to performance, which are
not covered under the Contract. If the assumption or condition proves
false the remedy shall be in effect. If remedy is not possible the
next step is renegotiation).
| Measure 1 - |
None |
| Measure 2 |
|
|
Expectation 2.a - None |
|
Expectation 2.b - Processing is completed in accordance
with existing project requirements. If additional unforeseen
Carlsbad Area Office (CAO) or regulatory agency
characterization/certification requirements are needed, the
completion criteria will be reassessed and the program will be
re-baselined per RL direction. |
|
Expectation 2.c -
- EPA and New Mexico Environmental Division support shipments
without additional shipment requirements.
- CAO/WIPP support shipments as scheduled (certification and
resources available).
- If shipments are delayed as a result of circumstances outside
the control of the Contractor, the completion criteria will be
reassessed and the program will be re-baselined per RL
direction.
|
|
|
______________________________________ E.S.
Aromi, S. Project Direct Waste Management Project |
__________________________ Date |
______________________________________ R.D.
Hanson, President CEO Fluor Daniel Hanford, Inc. |
__________________________ Date |
______________________________________ H.E.
Bilson, Director Waste Management Division |
__________________________ Date |
______________________________________ K.A.
Klein, Manager Richland Operations Office |
__________________________ Date |
|