DE-AC06-96RL13200
Modification M088 |
| FY 2000 PERFORMANCE INCENTIVE: Assist in the Creation of Non-Hanford Jobs | |||||||||||
| SECTION 1
GENERAL INFORMATION |
|||||||||||
|
|||||||||||
| SECTION
2 PERFORMANCE OUTCOMES |
|||||||||||
|
Check appropriate box: ¨ Outcome #1: Restore the River Corridor for multiple uses ¨ Transition Central Plateau to support long-term waste management þ Outcome #3: Put DOE Assets to work for the Future |
|||||||||||
| SECTION
3 PERFORMANCE OBJECTIVE (S), MEASURES PERFORMANCE EXPECTATION(S) |
|||||||||||
|
List associated performance objectives, measures, and performance expectations. Identify associated PBS # for each performance objective and/or measures. Performance Objective: Assist in the Creation of Non-Hanford Jobs PBS N/A Measure 1 - Number of new Non-Hanford jobs created
|
|||||||||||
| SECTION
4 FEE SCHEDULE |
|||||||||||
|
Identify fee schedule by performance objective and/or measure(s) Regular = 100% of the available fee for this Performance Incentive Regular
Note: Fiscal Year 01 is provided for future planning purposes. No fee is assigned to this item in FY00. |
|||||||||||
| SECTION
5 PERFORMANCE REQUIREMENTS |
|||||||||||
|
PREVIOUS YEARS GATEWAY: Describe previous years gateway (if applicable) that must be completed before fee can be paid under this performance measure. The requirements listed below are the gateway only requirements for this Performance Measure. (N/A in FY 2000) GENERAL REQUIREMENTS: In order to earn incentive fee under this Performance Incentive, the Contractor shall:
DEFINE COMPLETION: (Specify Performance Elements and describe indicators of success (quality/progress). Include baseline documentation/data against which completion documentation should be compared). "Completion" shall occur after DOE-RL formally approves the Completion Notice Package submitted by FDH. This package must contain the following minimum information: (1) summary table; (2) job count information; and (3) job assistance information. These are further explained in the following:
DEFINITIONS: (define terms)
COMPLETION DOCUMENTS LIST: (In addition to the Completion Notice the document(s) that should be submitted/data that should be available/actions to be taken by evaluator, to determine actual performance to the requirements stated above). The following documentation, as specified in "Define Completion above":
ASSUMPTIONS/TECHNICAL BOUNDARY CONDITIONS AND REMEDY STATED: (For reasonably foreseeable impacts to performance which are not covered under the Contract. If the assumption or condition proves false the remedy shall be in effect. If remedy is not possible the next step is renegotiation). None |
|||||||||||
| SECTION 6
SIGNATURES |
|||||||||||
|
|
| [Hanford Home Page] [PHMC Contract Index] [Mod List] |
| For questions
or comments about this page, please send
email to
Alan_E_Hopko@rl.gov The URL for this page is http://www.hanford.gov/phmc/contract/mods/ Document Number: DE-AC06-96RL13200 Mod: M088 |