![]() |
DE-AC06-96RL13200
Modification M089 |
This Modification incorporates current applicable Department of Labor (DOL) Wage Determinations into this contract as follows:
Contract Modification M039 dated September 25, 1998 incorporated Wage Determination 94-2570 (Revision 6). Modification M074 dated May 12, 1999 stated that the Wage Determination was applicable from August 6, 1998 to August 6, 1999. The Department of Labor has not issued a Determination to update Wage Determination 94-2570 (Revision 6). Thus, the determination will be applicable from August 6, 1999 to August 6, 2000.
Attachment 1 to this Modification are Wage Determination 94-2569 (Revision 10) and Wage Determination 98-0109 (Revision 1). Wage Determination 94-2569 (Revision 10) is applicable from August 6, 1999 to August 6, 2000. Wage Determination 98-0109 (Revision 1) includes three Collective Bargaining Agreements. The period of applicability of Wage Determination 98-109 is as stated in the Collective Bargaining Agreements.
Section J, Appendix C of the contract is hereby deleted and replaced with Attachment 2 to this Modification. The effective date for the additions and deletions of the Directives set forth in Section J, Appendix C, shall be thirty (30) days from the effective date of this modification. For DOE O 474.1, compliance will be completed within 180 days of the effective date of the addition. Compliance with DOE M 471.2-2 will be completed within 120 days from the effective date of the addition. Changes to Appendix C are summarized as follows:
| Deleted: | |
| DOE O 414.1 |
Quality Assurance |
| DOE 5633.3B | Control and Accountability of Nuclear Materials dated September 7, 1994 |
| DOE M 5639.6A-1 | Manual of Security Requirements for the Classified Automated Information System Security Program dated July 15, 1999 |
| DOE/RL-93-75 | Hanford Facility Contingency Plan |
| Added: | |
| DOE O 414.1A | Quality Assurance |
| DOE O 474.1 | Control and Accountability of Nuclear Materials |
| DOE M 471.2-2 | Classified Information Systems Security Manual |
| DOE N 473.1 | Carrying Semiautomatic Pistols with a
Round in the Chamber |
| Renamed: | |
| DOE/RL-94-02 is now named-- DOE/RL-94-02 |
Hanford Emergency Response Plan Hanford Emergency Management Plan |
| Updated: | |
| HNF-SD-MP-SRID-002 Rev. 2 is now-- HNF-SD-MP-SRID-002 Rev. 3 |
Fluor Daniel Hanford Contract Fluor Daniel Hanford Contract |
| HNF-SD-MP-SRID-003 Rev. 1 is now-- HNF-SD-MP-SRID-003 Rev. 2 |
Plutonium Finishing Plant Plutonium Finishing Plant |
| HNF-SD-MP-SRID-006 Rev. 0 is now-- HNF-SD-MP-SRID-006 Rev. 1 |
Fast Flux Test Facility Fast Flux Test Facility |
| HNF-SD-MP-SRID-011 is now-- HNF-SD-MP-SRID-011 Rev.1 |
Waste Management Operations Waste Management Operations |
Section J, Appendix N, Special Bank Account Agreement, for the Period October 1, 1999 though September 30, 2000, (Attachment 3 to this Modification) is added to the contract.
Section J, Appendix I, Small, Small HUBZone, Small Disadvantaged and Woman-Owned Small Business Subcontracting Plan for Fiscal Year 2000 (Attachment 4 to this Modification) is incorporated into the contract.
| [Hanford Home Page] [PHMC Contract Index] [Mod List] |
| For questions
or comments about this page, please send
email to
Alan_E_Hopko@rl.gov The URL for this page is http://www.hanford.gov/phmc/contract/mods/ Document Number: DE-AC06-96RL13200 Mod: M089 |