INFRASTRUCTURE (SOW Section C.4)
OBJECTIVE MEASURE EXPECTATION LEVEL
IS1 Maximize efficiency and effectiveness of RL site infrastructure supplies and services.

 

Percent of Fee Pool = 3%

IS1.1 * Maintenance backlog. IS1.1.1 * Reduce infrastructure maintenance backlog by 25% by 1/31/97.
IS1.2 * Material loss rate. IS1.2.1 * Reduce FY97 material losses rate to 2%.
IS1.3. Total cost for Hanford Local Area Network (HLAN). IS1.3.1. Total cost of HLAN $2300/ desktop computer workstation, including new equipment.
IS1.4. Annual sitewide costs for maintenance, storage, and document control of all site records. IS1.4.1. Cost of management, storage, and document control, cost per record for paper records, electronic records, and fiche records at 10% less than FY97 budget.
OBJECTIVE MEASURE EXPECTATION LEVEL
IS2 Optimize Cost of Intrastructure support and services.

 

Percent of fee pool = 6%

IS2.1 Cost of employee occupancy pool IS2.1.1 Cost of the employee occupancy pool reduced to 10% less than FY97 budget.
IS2.2 Cost/mile spent on personnel transportation. IS2.2.1 Reduce cost per mile for sitewide personnel transportation < $0.52/Mile. IS2.2.1.1 POSITIVE = Cost per mile for personnel transportation < $ 0.45/Mile.
IS2.3 Cost, above power purchase cost, for delivery of electrical utility services sitewide, maintaining satisfactory level of system availability and reliability. IS2.3.1 Reduce cost above purchased power cost for delivery of electrical utility service cost for transmission and distribution to $0.012/kilowatt hour.
IS2.4 Total price/gallon of potable water. IS2.4.1. Total price/gallon for sitewide potable water $ 0.0065.
IS2.5. * Infrastructure Operations and Maintenance. IS2.5.1. * Reduce infrastructure cost/work order by 30% by 1/31/97.
IS2.6 * Reduce inventory carrying costs. IS2.6.1. * Reduce inventory carrying costs by 25% in FY97 compared to FY95 actual costs.
IS2.7.* Reduce per unit costs for calibration services. IS2.7.1. * Reduce per unit costs for calibration services by 25% by 9/30/97.
OBJECTIVE MEASURE EXPECTATION LEVEL
IS3.* Outsource infrastructure support services available for procurement.

 

Percent of fee pool = 1%

IS3.1.* Outsource percentage IS3.1.1. * Outsource 90% of infrastructure support services available for procurement within 12 months of contract award. IS3.1.1.1.* POSITIVE: Outsource 90% of infrastructure support services available for procurement within 6 months of contract award.

$50,000