Tri-Party Agreement Change Requests

1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 
2009 
REQUEST APPROVAL DATE CHANGE REQUEST TITLE
M-15-93-01   01/04/1994  Constructability report for the 200-BP-1 Operable Unit (OU) prototype surface barrier  
M-15-93-02   01/25/1994  100-HR Area groundwater operable unit milestone revision  
M-15-93-04   01/25/1994  Establish milestones for a treatability test at a burial ground in the 100-B Area  
M-32-92-01  01/25/1994  Interim status dangerous waste tank systems Hanford Federal Facility Agreement and Consent Order Milestone, M-32  
M-33-93-01  01/25/1994  Establish milestone for determining integrated solid materials storage and processing requirements 
M-34-93-01  01/25/1994  Remediation of the K- Basins 
M-35-93-01  01/25/1994  Add data management milestones M-35-00, M-35-01, M-35-02, M-35-03 and M-35-04 to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) 
M-13-93-03   01/25/1994  200 Area groundwater operable units scope revision 
M-13-93-06   01/25/1994  Cleanup strategy documents for the Columbia River and Hanford groundwater 
M-13-94-01   01/25/1994  Consolidation of 300 Area Operable Units 300-FF-2, 300-FF-3, 300-FF-4, and 300-IU-1 
M-16-93-01  01/25/1994  Effluent pipeline expedited response action  
M-16-93-02  01/25/1994  Arid Land Ecology Reserve (ALE) assessment remediation 
M-16-93-03  01/25/1994  North Slope assessment and remediation 
M-26-93-01  01/25/1994  Tritiated waste water treatment evaluation 
M-41-93-01  01/25/1994  Single-Shell Tank interim stabilization 
M-44-93-01  01/25/1994  Double and Single-Shell Tank characterization 
M-45-93-01  01/25/1994  Complete closure of Single Shell Tank Farms 
M-46-93-01  01/25/1994  Future double shell tank capacity needs. 
M-50-93-01  01/25/1994  Establish milestones for tank waste pretreatment 
M-51-93-01  01/25/1994  Establish milestones for immobilization of high level tank waste  
M-60-93-01  01/25/1994  Establish milestones for immobilization of low level tank waste. 
M-42-93-01  01/25/1994  Additional and revised milestones for the Multi-Function Waste Tank Facility (MWTF) 
M-43-93-01  01/25/1994  Establish milestones for Tank Farm Upgrades Program 
M-70-93-01  01/25/1994  Design, approve, construct and operation of the Environmental Restoration Disposal Facility (ERDF) 
M-40-93-01  01/25/1994  ESTABLISH MILESTONES TO MITIGATE/RESOLVE TANK SAFETY ISSUES FOR HIGH PRIORITY WATCH LIST TANKS 
M-13-94-02   02/24/1994  Change the due date of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone, M-13-07, Submit Integrated 200-BP-11 Operable Unit and 216-B-3 Main Pond Work/Closure Plan to Ecology and EPA.  
E-94-01   02/24/1994  Update Appendix E for 1994 printing of the Hanford Federal Facility Agreement and Consent Order  
M-15-94-01  02/24/1994  Modify interim milestones for the 300-FF-5 Operable Unit RI/FS  
M-17-94-01  03/10/1994  Cease implementation of certain sampling and analysis plans 
C-93-1   04/14/1994  Consolidate Operable Units 100-DR-2, and 100-DR-3  
M-24-94-01  04/14/1994  Establish Calendar Year 1994 interim milestones for RCRA Well installation 
M-41-94-01  04/14/1994  Emergency pump assumed releaking Tank 241-T-111 
M-40-94-01  04/26/1994  M-40-13 design and fabricate a spare mixer pump for Tank 241-SY-101. September 1994 
M-14-94-01   05/11/1994  Revision to M-14-03, Initiate Operations Of 27 Module Waste Sampling and Characterization Facility (M-14-03)  
M-20-94-01  05/19/1994  Placement of M-20-31 and M-20-35 on hold 
M-40-94-03  05/26/1994  Modification to prerequisite activity for Milestone M-40-05 
M-60-94-01  06/30/1994  Change title due date change for Target Date M-60-01-T01 
M-43-94-01  06/30/1994  Align tank farm upgrades program documentation milestones with current systems engineering documentation requirements 
M-15-94-08   07/06/1994  100-BC-2 RI/FS interim milestones  
C-94-01   07/28/1994  Redesignate the 200-IU-4 Operable Unit as the 100-IU-6 Operable Unit  
M-20-94-04  08/02/1994  Modify B Plant Part B Permit Application Interim Milestone M-20-21A 
M-15-94-07   08/02/1994  100-HR-2 Operable Unit RFI/CMS interim milestones  
M-40-94-04  08/25/1994  Revise plan for installation of thermocouple trees in ferrocyanide tanks 
C-93-08   08/25/1994  Incorporation of Hanford Generating Plant (HGP) Solid Waste Management Units (SWMUs) into 100-NR-1 Operable Unit work scope  
M-15-94-03   09/15/1994  Establishment of interim milestones for 200-UP-2 Operable Unit (OU) documents, and integration of 216-U-12 Crib Closure/Postclosure Plan with 200-UP-2 OU Project  
M-40-94-05  10/12/1994  Complete removal of floating organic layer from Tank 241-C-103 
M-15-94-10   10/27/1994  Extend Milestones M-15-13G and M-15-13H to allow incorporation of new information obtained from supplemental limited field investigation in 100-FR-3 Operable Unit  
M-15-94-11   10/27/1994  Consolidate Operable Units 100-KR-2 and 100-KR-3  
M-34-94-01  11/29/1994  Date change for Targets M-34-00-T01 and M-34-00-T02  
M-15-94-05A   12/20/1994  100-DR-1 Operable Unit treatability study milestone extension  
M-26-94-01  12/20/1994  Revise LERF Milestones M-26-03 and M-26-04 pending decision regarding future uses of LERF 
M-20-94-08  12/30/1994  Delete Interim Milestone M-20-42 and replace with Interim Milestone M-20-42A 
M-20-94-09  12/30/1994  Delete Interim Milestone M-20-43 and replace with Interim Milestone M-20-43A 