1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
|
|
| REQUEST |
APPROVAL DATE |
CHANGE REQUEST TITLE |
| M-15-93-01 |
01/04/1994 |
Constructability report for the 200-BP-1 Operable Unit (OU) prototype surface barrier |
| M-15-93-02 |
01/25/1994 |
100-HR Area groundwater operable unit milestone revision |
| M-15-93-04 |
01/25/1994 |
Establish milestones for a treatability test at a burial ground in the 100-B Area |
| M-32-92-01 |
01/25/1994 |
Interim status dangerous waste tank systems Hanford Federal Facility Agreement and Consent Order Milestone, M-32 |
| M-33-93-01 |
01/25/1994 |
Establish milestone for determining integrated solid materials storage and processing requirements |
| M-34-93-01 |
01/25/1994 |
Remediation of the K- Basins |
| M-35-93-01 |
01/25/1994 |
Add data management milestones M-35-00, M-35-01, M-35-02, M-35-03 and M-35-04 to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) |
| M-13-93-03 |
01/25/1994 |
200 Area groundwater operable units scope revision |
| M-13-93-06 |
01/25/1994 |
Cleanup strategy documents for the Columbia River and Hanford groundwater |
| M-13-94-01 |
01/25/1994 |
Consolidation of 300 Area Operable Units 300-FF-2, 300-FF-3, 300-FF-4, and 300-IU-1 |
| M-16-93-01 |
01/25/1994 |
Effluent pipeline expedited response action |
| M-16-93-02 |
01/25/1994 |
Arid Land Ecology Reserve (ALE) assessment remediation |
| M-16-93-03 |
01/25/1994 |
North Slope assessment and remediation |
| M-26-93-01 |
01/25/1994 |
Tritiated waste water treatment evaluation |
| M-41-93-01 |
01/25/1994 |
Single-Shell Tank interim stabilization |
| M-44-93-01 |
01/25/1994 |
Double and Single-Shell Tank characterization |
| M-45-93-01 |
01/25/1994 |
Complete closure of Single Shell Tank Farms |
| M-46-93-01 |
01/25/1994 |
Future double shell tank capacity needs. |
| M-50-93-01 |
01/25/1994 |
Establish milestones for tank waste pretreatment |
| M-51-93-01 |
01/25/1994 |
Establish milestones for immobilization of high level tank waste |
| M-60-93-01 |
01/25/1994 |
Establish milestones for immobilization of low level tank waste. |
| M-42-93-01 |
01/25/1994 |
Additional and revised milestones for the Multi-Function Waste Tank Facility (MWTF) |
| M-43-93-01 |
01/25/1994 |
Establish milestones for Tank Farm Upgrades Program |
| M-70-93-01 |
01/25/1994 |
Design, approve, construct and operation of the Environmental Restoration Disposal Facility (ERDF) |
| M-40-93-01 |
01/25/1994 |
ESTABLISH MILESTONES TO MITIGATE/RESOLVE TANK SAFETY ISSUES FOR HIGH PRIORITY WATCH LIST TANKS |
| M-13-94-02 |
02/24/1994 |
Change the due date of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone, M-13-07, Submit Integrated 200-BP-11 Operable Unit and 216-B-3 Main Pond Work/Closure Plan to Ecology and EPA. |
| E-94-01 |
02/24/1994 |
Update Appendix E for 1994 printing of the Hanford Federal Facility Agreement and Consent Order |
| M-15-94-01 |
02/24/1994 |
Modify interim milestones for the 300-FF-5 Operable Unit RI/FS |
| M-17-94-01 |
03/10/1994 |
Cease implementation of certain sampling and analysis plans |
| C-93-1 |
04/14/1994 |
Consolidate Operable Units 100-DR-2, and 100-DR-3 |
| M-24-94-01 |
04/14/1994 |
Establish Calendar Year 1994 interim milestones for RCRA Well installation |
| M-41-94-01 |
04/14/1994 |
Emergency pump assumed releaking Tank 241-T-111 |
| M-40-94-01 |
04/26/1994 |
M-40-13 design and fabricate a spare mixer pump for Tank 241-SY-101. September 1994 |
| M-14-94-01 |
05/11/1994 |
Revision to M-14-03, Initiate Operations Of 27 Module Waste Sampling and Characterization Facility (M-14-03) |
| M-20-94-01 |
05/19/1994 |
Placement of M-20-31 and M-20-35 on hold |
| M-40-94-03 |
05/26/1994 |
Modification to prerequisite activity for Milestone M-40-05 |
| M-60-94-01 |
06/30/1994 |
Change title due date change for Target Date M-60-01-T01 |
| M-43-94-01 |
06/30/1994 |
Align tank farm upgrades program documentation milestones with current systems engineering documentation requirements |
| M-15-94-08 |
07/06/1994 |
100-BC-2 RI/FS interim milestones |
| C-94-01 |
07/28/1994 |
Redesignate the 200-IU-4 Operable Unit as the 100-IU-6 Operable Unit |
| M-20-94-04 |
08/02/1994 |
Modify B Plant Part B Permit Application Interim Milestone M-20-21A |
| M-15-94-07 |
08/02/1994 |
100-HR-2 Operable Unit RFI/CMS interim milestones |
| M-40-94-04 |
08/25/1994 |
Revise plan for installation of thermocouple trees in ferrocyanide tanks |
| C-93-08 |
08/25/1994 |
Incorporation of Hanford Generating Plant (HGP) Solid Waste Management Units (SWMUs) into 100-NR-1 Operable Unit work scope |
| M-15-94-03 |
09/15/1994 |
Establishment of interim milestones for 200-UP-2 Operable Unit (OU) documents, and integration of 216-U-12 Crib Closure/Postclosure Plan with 200-UP-2 OU Project |
| M-40-94-05 |
10/12/1994 |
Complete removal of floating organic layer from Tank 241-C-103 |
| M-15-94-10 |
10/27/1994 |
Extend Milestones M-15-13G and M-15-13H to allow incorporation of new information obtained from supplemental limited field investigation in 100-FR-3 Operable Unit |
| M-15-94-11 |
10/27/1994 |
Consolidate Operable Units 100-KR-2 and 100-KR-3 |
| M-34-94-01 |
11/29/1994 |
Date change for Targets M-34-00-T01 and M-34-00-T02 |
| M-15-94-05A |
12/20/1994 |
100-DR-1 Operable Unit treatability study milestone extension |
| M-26-94-01 |
12/20/1994 |
Revise LERF Milestones M-26-03 and M-26-04 pending decision regarding future uses of LERF |
| M-20-94-08 |
12/30/1994 |
Delete Interim Milestone M-20-42 and replace with Interim Milestone M-20-42A |
| M-20-94-09 |
12/30/1994 |
Delete Interim Milestone M-20-43 and replace with Interim Milestone M-20-43A |