REQUEST APPROVAL DATE CHANGE REQUEST TITLE
M-17-95-01  01/24/1995  Revise Interim Milestone M-17-06K to clarify scope and intent of Project L-070 deliverables  
M-20-94-06  01/24/1995  Waste management unit addition and boundary change to the 200-BP-11 Operable Unit 
M-41-94-03  01/24/1995  Establish milestone date for delivery of high level liquid waste transport cask 
M-45-94-01  01/30/1995  Date changes for Interim Milestone M-45-07B and Target Date M-45-07-T01 
M-34-95-01  01/31/1995  Revision to M-34-00-T05 description 
M-35-95-01  02/15/1995  M-35-04 change package milestones 
M-41-95-01  02/17/1995  Target Milestone M-41-01-T02, modification in completion date 
M-41-94-02  02/22/1995  Revise schedule to pump 241-BX and BY farms before 241-U Farm 
D-94-01A   02/22/1995  Expansion of Hanford Federal Facility Agreement and Consent Order milestone numbering scheme  
M-32-94-01  04/05/1995  Addition of target actions to B Plant Interim Milestone M-32-07 
M-20-94-05  05/09/1995  Milestone M-20-00 Modification (1994 ER Refocusing Negotiations) 
M-13-94-03   05/09/1995  M-13-00 modification (1994 refocusing negotiations)  
M-15-94-04   05/09/1995  100-N Area pilot project  
M-15-94-09   05/09/1995  M-15-00 modification (1994 refocusing negotiations)  
M-16-94-03  05/09/1995  M-16-00 modification (1994 ER refocusing negotiations) 
M-45-95-01  05/16/1995  New Interim Milestones M-45-08, M-45-09 and completion of M-45-07B 
M-15-95-06   06/01/1995  Establishing 100-KR-2 RI/FS interim milestones  
M-15-95-07   06/01/1995  Establishing 100-DR-2 RI/FS interim milestones  
M-40-95-01  06/28/1995  Delete Milestones M-40-04-T02 and M-40-04 
M-26-95-01  06/28/1995  Delete Milestones M-26-03 and M-26-04 to allow continued use of LERF 
M-17-95-02  07/13/1995  Revise M-17-00A to allow for temporary storage pending implementation of BAT/AKART 
M-16-95-03  07/26/1995  Close TPA Milestone M-16-12A and establish new Interim Milestone M-16-12F, complete dose reduction activities at Columbia River shoreline by decontamination of 1304-N Emergency Dump Tank (EDT) by September 30, 1995  
M-20-94-07  07/28/1995  Milestone M-20-00 modification (1994 Facility Transition Negotiations) 
A-94-01   07/28/1995  Modify Appendix A to include facility decommissioning process terms, update environmental restoration terms, and make other updates  
M-80-94-01  07/28/1995  Establish milestones and target dates for PUREX and UO3 facility transition, Milestone Series M-80 
M-81-94-01  07/28/1995  Establish milestones and target dates for the Fast Flux Test Facility (FFTF) transition, Milestone Series M-81 
M-83-94-01  07/28/1995  Establish milestones for the stabilization of process areas in PFP, Milestone Series M-83 
M-89-94-01  07/28/1995  Complete closure of non-permitted Mixed Waste (MW) units in the 324 Building Radiochemical Engineering Cell (REC) and High Level Vault (HLV) 
M-13-95-01   08/07/1995  200-PO-1 Operable Unit permit modification  
M-17-95-04  08/14/1995  Design changes to 300 Area process sewer piping replacement (TPA Milestone M-17-06K) to utilize existing piping that is in good condition  
M-41-95-03  08/22/1995  Modify scope of Interim Milestone M-41-12 
C-95-01A   09/27/1995  Redesignation of 100-HR-1 and 100-DR-1 Operable Units (OUs) from RCRA past practice units to CERCLA past practice units  
M-15-95-08   09/29/1995  Delete M-15-21 Milestone for preparing the IRM proposed plan for the 200-BP-5 Operable Unit, currently due on October 31, 1995  
M-32-95-02  11/15/1995  Revision to B Plant Interim Milestone M-32-07 and to Target Action M-32-07-T05 and addition of Target Action M-32-07-T06  
M-42-95-01  12/01/1995  Change Milestone M-42-00. Provide additional double shell tank capacity 
M-15-95-09   12/20/1995  Modification to M-15-80 Milestone, the Columbia River Comprehensive Impact Assessment (CRCIA), scope and schedule  
M-15-95-10   12/20/1995  Substitution of focus sheet for the 100-FR-3 proposed plan as the deliverable for Milestone M-15-13H  
M-18-95-01  12/29/1995  Revise completion date for Milestone M-18-01, complete construction of WRAP 1 