All Galleries
STEM Students Visit HAMMER (May 2026)
Fiber Optic Installation (May 2026)
New Era in 200 West Area (April 2026)
Unmanned Aircraft Systems (January 2026)
Active Shooter Scenarios (January 2026)
3D Printing Shapes Innovation (January 2026)
Solidifying Tank Waste (October 2025)
President John F. Kennedy Visits Hanford
LIDAR Reactor Inspections (August 2025)
Tank Waste Treated (July 2025)
High-Pressure Nozzle Install (July 2025)
Fire System Maintenance (December 2024)
Crane and Rigging (December 2024)
Temporary Pumping Station (December 2024)
WESF Updates (November 2024)
Switchgear Maintenance (November 2024)
Radiological Monitoring System (November 2024)
Remote Control Cranes (November 2024)
RC Crane Training (September 2024)
Hanford Field Office (October 2024)
Monitoring Hanford's Wildlife (November 2024)
Tank Waste Treated for TBI (October 2024)
Active Assailant Drill (November 2024)
In-Tank Lighting System (November 2024)
Fire Fighter Graduation (November 2024)
Met Tower Repairs (October 2024)
Hanford Borrow Pits (October 2024)
Defueled Reactor Compartment Arrival (October 2024)
Attending the Women in Engineering Conference (October 2024)
Reactor Compartment Shipment (October 2024)
Test Bed Initiative (August 2024)
Last Reactor Fuel Storage Basin Drained (July 2024)
REDOX Demolition (July 2024)
Underground Tank Removal (July 2024)
Carbon Steel Door Installation at the High-Level Waste Facility (May 2024)
First Sodium Shipment (March 2024)
Demolition of TK-40 (March 2024)
Groundwater Treatment Expansion (February 2024)
Infrastructure Upgrades (January 2024)
HAMMER Respiratory Training (December 2023)
PUREX demolition work (December 2023)
231-Z Demolition Preparation (December 2023)
Worker Trainer Safety Course (December 2023)
Lighting Upgrades in A Fam (January 2024)
Installation of groundwater wells (January 2024)
Removal of Heavy Cover Blocks (January 2024)
First Filled Container at WTP (December 2023)
U Farm Surface Barrier (October 2023)
HAMMER - As Real as it Gets (September 2023)
REDOX Ventilation (October 2023)
National Archives (August 2023)
Molten Glass (August 2023)
AY-01A Pump Pull (July 2023)
Hanford Leachate Tanks (June 2023)
324 Stack Maintenance (May 2023)
Lance Demonstration (May 2023)
K Basin Dewatering (May 2023)
Magpie nest (May 2023)
224B Tunnel (April 2023)
Demolition of 215C and 276C Buildings (February 2023)
PUREX REDOX (July 2023)
100K Update - (May 2023)
ERDF Cable Disposal (May 2023)
New Hanford Site Water Tank - (July 2023)
Hanford Site Road Repairs (May 2023)
Completion of 4th basin at the Liquid Effluent Retention Facility
215C Demo (February 2023)
Accessing the PUREX Tank (February 2023)
U Tank Farm Basin Seeding (October 2022)
Metron Cabinet Removed (February 2023)
Quality Meters Installed (February 2023)
Hanford Firefighter Graduation (September 2022)
Entomology Collection at Washington State University (October 2022)
Central Waste Complex Waste Box (November 2022)
WESF/MASF (January 2023)
HMIS - Energy Saving
HAB Tour of 324 (November 2022)
Hanford Site Mock Drill (November 2022)
PUREX 203A Placing Bags (December 2022)
A Tank Farm (December 2022)
Effluent Treatment Facility Heated Tents (January 2023)
Fall Protection Training (January 2023)
REDOX Exhauster Ducting (January 2023)
Spare Evaporator Pump (December 2022)
K Basin Floor Vacuum (January 2023)
Cocooning of the E East Reactor (November 2022)
Loading glass-forming materials into silos for the Low-Activity Waste Facility
Installation of roll-up door in the Reduction Oxidation Plant (January 2023)
Installation of Wastewater Storage Tanks at the Integrated Disposal Facility (January 2023)
Hanford Wildlife
Sludge Removal at 105-K West Reactor (2018)
PFP Stack Demolition July 2017
Plutonium Reclamation and Recovery Facility Demoliton
Plutonium Finishing Plant HA-9A glove box removal
Chromium removal
McCluskey Room progress
Demolishing Support Buildings at Plutonium Finishing Plant
PRC River Corridor
PRC Decommisioning and Demolition
PRC 200 W Groundwater Treatment Project
PRC 100 HX Groundwater Treatment Facility
PRC 100 DX Groundwater Treatment Facility
PRC Waste and Fuels
PRC Soil and Groundwater Remediation
PRC Sludge Treatment
PRC Plutonium Finishing Plant
PRC Main Gallery
Fast Flux Test Facility
340 Vault Removal
Secretary Ernest Moniz Visits Hanford
Groundwater Treatment Record 2012 - 2013
Groundwater Treatment Resin
Senator Murray Visits Hanford 2013
PFP Glovebox Separation
Gov Inslee Tours WTP and TF
Cocooning K East Reactor
D Area Field Remediation
PFP Glovebox Removal
F Area Complete
Highly Radioactive Sludge Removal Complete
200W Pump and Treat Event
Demolishing K East Water Structures
Moving Sludge off the River
WESF Capsule Shuffle
Secretary Chu Visits Hanford
200 West Groundwater Treatment LEED Facility
N Reactor River Structures Removed
Last Fuel Shipment Leaves River
PFP Vault Complex
308 Building Demolition
Removing Pencil Tanks
209-E Critical Mass Laboratory Demolition
Groundwater
Demolition of Plutonium Vaults
284 West Boiler Demolition
U Canyon -- D10 Tank
BC Control Area Remediation
618-10 Burial Ground
Shipping Mixed, Low-Level Waste
Pretreatment Facility
100HX Groundwater Treatment Facility
U Canyon Grout
Railcars Go To B Reactor
Deep Vadoze Zone Initiative
N Reactor Cocooning
284 East Explosive Demolition
284 West Explosive Demolition
100DX Groundwater Treatment Facility
Deep Vadose Zone
Improving Access to Tank C-107
ALE Cleanup Completion (2010)
324 Building
Railroad Track Removal
Plutonium Finishing Plant Security Equipment Removal
K West Sedimentation Basin June - August 2010
Rattlesnake Communications Tower Demolition
300 Area Explosive Demolition
200 West Groundwater Treatment Facility Construction
327 Building Demolition
Demolition of K East Reactor Stack
Railcars at Hanford
U Canyon Deck
K East Basin Removal 2009
American Recovery and Reinvestment Act 2009
N Reactor Demolition 2009
Settlers