WRPS Contract Modifications

Contract No. DE-AC27-08RV14800

  • 591 - Incremental Funding
  • 590 - Extend CARES Act & Revise effective date in clause H.61
  • 589 - Expiration of Partial Stop Work Order
  • 588 - Section J.4, PEMP_Add FY21
  • 587 - TSCR Demo Subproject Deletion
  • 586 - Funding Mod
  • 585 - FY20 PEMP Revision 3
  • 584 - FY21 Contract Extension and NTE_Updates to Sections B, C, and F
  • 583 - Funding Mod
  • 582 - Definitization of LLW Offsite Disposal
  • 581 - Incremental Funding (includes COVID-19)
  • 580 - Incremental Funding (includes COVID-19)
  • 579 - Definitization Change Order for LERF DSA
  • 578 - Section B – Incremental Funding
  • 577 - Partial Stop Work Order Extension
  • 576 - Incremental Funding and update Attachment J.9 Special Financial Institute Account Agreement
  • 575 - Partial Stop Work Order Extension
  • 574 - FY20 PEMP Revision 2
  • 573 - Section B – Incremental Funding
  • 572 - Section H Update, update COVID 19 CARES Act Clause
  • 571 - Definitization of TSCR Demonstration Project Additional Filter Testing
  • 570 - Section B Incremental Funding
  • 569 - Section H Update, add COVID 19 CARES Act Clause
  • 568 - Sections, F, H & J.6 – Admin Mod
  • 567 - Section B – Incremental Funding
  • 566 - NTE for Effluent Test Facility Additional FY20 Work Scope
  • 565 - Definitization of Undistributed Budget Deletions
  • 564 - Section B – Incremental Funding
  • 563 - NTE for TBI Low-Level Waste Offsite Disposal
  • 562 - Section B – REA SX Barrier Vapor Impacts
  • 561 - Section B – Incremental Funding
  • 560 - Section J.3 – Hanford Site Services and Interface Requirements Matrix
  • 559 - Section B – Incremental Funding
  • 558 - Section B – Incremental Funding
  • 557 - Section B – Incremental Funding
  • 556 – Definitization of FY20 Contract Extension, FY20 Additional Work Scope and PEMP Rev. 1
  • 555 – Section B – Incremental Funding
  • 554 - Section B updates and Definitization of Cyber Security and LERF Basin 41
  • 553 – Section B – Incremental Funding
  • 552 - Section J.10 – Wage Determination
  • 551 - Section J.13 & J.14 Updates
  • 550 - NTE Increase for FY20 Contract Extension
  • 549 - Incremental Funding
  • 548 - Incremental Funding
  • 547 - NTE Increase for FY20 Contract Extension
  • 546 - Section B  - Incremental Funding
  • 545 - Section B – Incremental Funding
  • 544 - Section J.4, PEMP_Add FY20
  • 543 -  FY20 Contract Extension and NTE_Updates to Sections B, C, and H
  • 542 – Section B updates and Definitization of LAWPS, VSL, & WTP Spare Parts
  • 541 – Section Updates to H, J.2, J.3 and J.10
  • 540 - FY19 PEMP Revision 2
  • 539 - ACES to SENTINEL Definitization
  • 538 - Section B - Incremental Funding
  • 537 - Procurement Staging Package FY20 Definitization
  • 536 - Test Bed Initiative Phase 2 Definitization
  • 535 - Section B – Incremental Funding
  • 534 - Additional Appropriations Phases 1 and 2 Definitizations
  • 533 - Disposition of Glass Containers Definitization
  • 532 - Section B – Incremental Funding and Section J, Attach J.9 – Financial Agreement
  • 531 - First 2,000 Gallon Test Bed Initiative Definitization
  • 530 - Tank Farm Upgrades II Definitization
  • 529 – FY20 Acceleration Definitization
  • 528 – NTE Increase for TBI Phase 2_SY-101 Farm
  • 527 – Section B – Incremental Funding
  • 526 – Section B – Incremental Funding and Funding Correction
  • 525 – Section B – Incremental Funding
  • 524 – FY19 PEMP Revision 1
  • 523 – Section B Funding Correction
  • 522 – Section B – Incremental Funding
  • 521 – Section B – Incremental Funding
  • 520 - Update Section H.57, List of CORs
  • 519 – Updates to Section I and J.6
  • 518 - Section B - Incremental Funding
  • 517 - NTE Increase for Tank Farm Upgrades II
  • 516 - Incorporate cost and fee for Tank Farm 242-A Evaporator PB-1 and PB-2 pump replacement change proposal CP-18-017
  • 515 - Administrative Mod to Correct Mod 514
  • 514 - Section B - Incremental Funding
  • 513 - Section B - Incremental Funding
  • 512 - Section B - Incremental Funding
  • 511 – TBI and ACES Sentinal NTE
  • 510 - Definitize the CH TRU Project Planning Effort
  • 509 - Section B - Incremental Funding
  • 508 - Definitize four contract changes for TF Upgrades to Support DFLAW, AY-102 Phases 3 & 4, SX Barrier Expansion Construction, and Fire Alarm Panel Upgrades
  • 507 - NTE for Tank Farm Upgrades II
  • 506 - Update Section B
  • 505 - TOC One-Year Contract Extension Through FY2019
  • 504 - Section B - Incremental Funding
  • 503 - Wage Determination Update and add 52.222.62
  • 502 - FAR 52.243-22 Changes - Cost Reimbursement
  • 501 - Section B – Incremental Funding
  • 500 - FAR 52.243-22 Changes - Cost Reimbursement
  • 499 – LAWPS De-Obligation
  • 498 - FY19 PEMP
  • 497 - NTE Increase for AY 102 Phases 3 & 4
  • 496 - Section B - Incremental Funding
  • 495 - Section B - Incremental Funding
  • 494 – NTE Increase for LAWPS
  • 493 - FY 18 PEMP Revision 2
  • 492 - Definitization of REA for Vapor Impacts on DST Work Scope & Execution
  • 491 - Section B - Incremental Funding
  • 490 - NTE Increase for Test Bed Initiative
  • 489 – Section B - Incremental Funding
  • 488 – Section B - Incremental Funding
  • 487 – Definitization of CVAP KPPs
  • 486 - Change Order Annulus, Transfer Lines, SX Barrier, WTP Transition Support
  • 485 – Section B - Incremental Funding
  • 484 – Definitization of PSSD for ILAW Container
  • 483 – Section B - Incremental Funding
  • 482 - Section B – Incremental Funding
  • 481 – NTE for ILAW Transporter Testing
  • 480 – FAR 52.243-2 Changes - Cost Reimbursement
  • 479 - Definitize PUREX Tunnel Event Request
  • 478 – Definitize Field Lysimeter Test Facility
  • 477 – NTE Increase – CVAP KPPs
  • 476 - Section B - Incremental Funding
  • 475 – NTE Increase- Tank Farm Upgrades to Support DFLAW
  • 474 - Update Sections H, J.2, J.6 and J.10
  • 473 – Section B - Incremental Funding
  • 472 - Section B – Incremental Funding
  • 471 – Section B - Incremental Funding
  • 470 – Section H Updates
  • 469 - NTE Increase for WTP Transition Support
  • 468 – Section B - Incremental Funding
  • 467 – NTE Increase for 222-SA Cold Lab Design 
  • 466 - Section B - Incremental Funding
  • 465 - Section B - Incremental Funding
  • 464 - FY 18 PEMP Revision 1
  • 463 - Section B - Incremental Funding
  • 461 - Infrastructure Support Costs (MSA J3 Services)
  • 460 - NTE Increase for Package Specific Safety Document for Immobilized Low-Activity Waste Container
  • 459 - NTE Increases for CVAP KPPs and SX Barrier Expansion Design
  • 458 - Section B – Incremental Funding
  • 457 - NTE Increase Tank Farm Upgrades to Support DFLAW
  • 456 - NTE Increase AY-102 Phase 3
  • 455- Section J.2 - Requirement Sources and Implementing Documents
  • 454 - FY 2018 PEMP
  • 453 - Update Sections B, C, H,  I, J2, J6,
  • 452 - Section B – Incremental Funding
  • 451 - Section J.2 – DOE Order 232.2A, Occurrence Reporting and Processing of Operations Info
  • 450 - NTE for the WTP Transition Support and Incremental Funding 
  • 449 - Section B – Incremental Funding
  • 448 - 222-SA Cold Lab Design Only Definitization
  • 447 - Section B – Incremental Funding
  • 446 - Delete Mod 440 and de-obligate funds
  • 445 - NTE Increase for FY17 Buyback New Scope
  • 444 - NTE Increase for CVAP KPPs
  • 443 - NTE Increase for AY-102 Phase 3
  • 442 - Section B – Incremental Funding
  • 441 - FY 2017 PEMP Update
  • 440 - NTE for WTP Transition Support
  • 439 - Vapors-Impacted Work Scope Not Previously Negotiated
  • 437 - Section J, Attachment J.10 – Wage Determinations – Service Contract Act and Davis Bacon Act
  • 436 - Section B - Incremental Funding
  • 434 - FAR 52.243-2 Changes - Cost Reimbursement
  • 433 - Definitization ETF IQRPE
  • 432 - Section B – Incremental Funding
  • 431 - Section B - Incremental Funding
  • 430 - Section B, J.2; FAR 52.243-2 Changes - Cost Reimbursement
  • 429 - Section B - Incremental Funding
  • 428 - Section B - Incremental Funding
  • 427 - FAR 52.243-2 Changes - Cost Reimbursement
  • 426 - NTE Increase for AY-102 Phase 3
  • 424 - NTE for Package-Specific Safety Document for ILAW Container
  • 423 - NTE for the LAWPS Design Maturity Increase
  • 422 - Price reduction WTP Design Operability
  • 421 - Section H Updates
  • 420 - Definitization of 242-A Spare Reboiler and 242-A DSA Upgrades
  • 419 - Section B - Incremental Funding
  • 418 - Not to Exceed for AY 102 Phase III
  • 417 - Section B - Incremental Funding
  • 416 - Not to Exceed for C-105 Third Technology
  • 415 - Section B - Incremental Funding
  • 414 - Updates to Sections C, H-52, J, J.3, J.9 & J.10
  • 413 - Not to Exceed for IQRPE
  • 412 - Section B - Incremental Funding
  • 411 – Section B – Incremental Funding
  • 410 – NTE for LAWPS Safety Design Strategy
  • 409 – NTE for C-105 Sluicing Alternative – 3rd Technology
  • 408 – Definitize LAW Radioactive Test Bed Change Order
  • 407 – Section B – Incremental Funding
  • 406 – NTE 222-SA Cold Lab Construction Bid Process
  • 405 - Definitization of Option Period
  • 404 - Contract Section J.4, 2017 PEMP
  • 403 - Contract Section J.4, Update 2016 PEMP
  • 402 - FY 2016 PEMP Update
  • 401 - Definitize Vapor Implementation Plan Phase 1
  • 400 - NTE Increase for LAW Radioactive Test Bed
  • 399 – NTE Increase for 222-SA Cold Lab Design
  • 398 - Infrastructure Support Costs and Caustic Recycle conceptual design effort
  • 397 - NTE Increase for 242-A Evaporator Re-Boiler Design and Fabrication
  • 396 - NTE for LAW Radioactive Test Beds
  • 395 - Funding for BPA, WRPS 2016, WRPS Spares, Lab Equipment, ETF Spares & Reallocate BPA Reimbursement to WRPS
  • 394 - Update Section J – Subcontracting Plan Narrative Updates
  • 393 - Definitization ETF Upgrades and Operations
  • 392 - NTE for 242-A Evaporator Reboiler
  • 391 - Updates to Sections H & I
  • 390 - NTE Increase for 222-SA Cold Lab Design
  • 389 - Obligate Incremental Funds
  • 388 - Updates to Section J.3 and J.4_PEMP Changes
  • 387 - Definitize change proposal number CP-15-016 (WRPS-1503639 R2, dated December 17, 2015) for the LAWPS Advance Conceptual Design and incorporate the statement of work.
  • 386 - Definitization of FY16 Vapors Impacts
  • 385 - Obligate Incremental Funds
  • 384 - Funding for Rocky Flats and Mound Pensions and Benefits Administration
  • 383 - NTE Increase for ETF Upgrades & Operations
  • 382 - Updates to Contract Sections J and J.3
  • 381 - Funding for Low Activity Waste Radioactive Test Beds
  • 380 - Funding – WRPS 2016, WRPS Spares, LAWPS Capital, Lab Equipment & WAI Supplies
  • 379 - NTE Increase for C-105 Third Technology
  • 378 - Increase the NTE for the Chemical Vapors Implementation Plan
  • 377 - NTE Increase for 222-SA Cold Lab Design
  • 376 - Obligate Incremental Funds
  • 375 - NTE for LAWPS Updated Design Direction
  • 374 - NTE Increase - ETF Upgrades and Operations
  • 373 - Definitization the Chemical Vapors impacts for Fiscal Year 2015
  • 372 - Funding – WRPS 2016, Spares, and LAWPS
  • 371 - Update Contract Sections C, I, J.2, and J.9
  • 370 - Update Section H
  • 369 - Funding - LAWPS Capital and 2008 Tank Farms
  • 368 - NTE for 222SA
  • 367 - NTE Increase for ETF Upgrades & Operations
  • 366 - NTE for LAWPS Updated Design Direction
  • 365 - Funding
  • 364 - Definitization for 420.1C, Lockout/Tagout Procedures Rev.2, Re-Configured Isolok Testing, & DNFSB-2012-2 Ductwork Mod
  • 363 - NTE for Caustic Recycle Scope Definition
  • 362 - Funding – Deobligation of PD Funds
  • 361 - Obligate Incremental Funds
  • 360 - Upda ted Key Personnel & CORs
  • 359 - Definitization of C-107 3rd Technology, AN Water Flush System, ETF Heat Exchanger Replacement, Fall Protection Program Rev 1A, White Bluffs 10-Wide Mobile Facility and Gable 10-Wide Mobile Facilities
  • 358 - Obligate Incremental Funds
  • 357 - NTE Increase – Isolok Accuracy Testing
  • 356 - Funding for Rocky Flats Admin
  • 355 - Definitization of AY-102
  • 354 - Update Contract Section H
  • 353 - Funding-IEWO M47RF0005
  • 352 - Funding-2016 Base Funds, LAWPS, Capital Equipment, 222-S Lab Supplies
  • 351 - Funding-2012, 2013, 2014 and 2015 Base Funding
  • 350 - Incorporate FY16 PEMP
  • 349 - Update FY15 PEMP, PBI 11.2
  • 348 - Definitization of AP Farm Ventilation Upgrades
  • 347 - Funding-Base Operations
  • 346 - Funding-Spares, Work for Others, Base Operations
  • 345 - Definitization of Vapors CAP, DOE 414.1D, WTP FY15 Support, IDF PA, ETF Transition
  • 344 - Funding-Base Funding
  • 343 - Definitization of Relocation costs, ETF Turnover Prep, 13.8kV Line Upgrade, C-101  and C-112 3rd Technology, LAW Design Review, and 222-S Lab Room Upgrade
  • 342 - Funding-Base Ops and LAWPS
  • 341- NTE Increase 222-S Lab Room Upgrades
  • 340- Funding-Base Ops, Rocky Flats and Mound Pension, LAW Design Review, and Capital Equipment
  • 339- NTE Increase ETF Heat Exchanger
  • 338 - NTE Increase AP Farm Ventilation Upgrades
  • 337- Definitization of Integrated Test Facility
  • 336- NTE Increase IDF PA
  • 335- NTE Increase AP Farm Ventilation Upgrades
  • 334- Definitization of several contract changes
  • 333 - NTE Increase of $250k for 222-S Lab Room 1GB Upgrade
  • 332 - A/AX Definitization
  • 331 - FY2015 PEMP Update
  • 330 - Update Contract Sections C, G, H, I and J
  • 329 - Change Order-DOE O 420.1C, Facility Safety, for LAWPS
  • 328 - Change Order-LAWPS Integrated Testing
  • 327 - Change Order-Isolek Accuracy Testing
  • 326 - Funding-Base Operations, Capital Equipment, LAWPS
  • 325 - Change Order-DNFSB 2012-2 Ductwork
  • 324 - Change Order-Trailer Building #2
  • 323 - Change Order-Trailer Building #1
  • 322 - Definitization of DNFSB 2012-2, Part 2, Small Scale Solids Delivery Testing and SSST Intrusion Mitigation cost and fee
  • 321 - NTE Increase of $250K for 222-S Lab Room 1GB Upgrade
  • 320 - NTE Increase of $740K for IDF PA
  • 319 - Change Order to begin implementation of the U.S. Department of Energy (DOE) Order (O) 420.1C, Facility Safety
  • 318 - Funding-Base Operations, Mound Pension, LAWPS
  • 317 - Office of River Protection (ORP) Tank Vapors Assessment Team (TVAT) recommendations Not to Exceed value increase
  • 316 - ETF Operations NTE Increase
  • 315 - Funding
  • 314 - Change Order C-105 Third Technology
  • 313 - ETF Transition Support NTE Increase
  • 312 - AY-102 Phase 2 NTE Increase
  • 311 - NTE Increase of $250K for IDF PA
  • 310 - Definitization of DFLAW, Small Scale Liquid Testing and DNFSB 2012-2
  • 309 - TVAT Change Order and NTE Authorization
  • 308 - LAWPS NTE Increase
  • 307 - Funding-Pensions
  • 306 - NTE Increase of $400K for 222-S Lab Room 1GB Upgrades
  • 305 - Change Order for the Effluent Treatment Facility Transition Support costs.
  • 304 - To Definitize Direct Feed Low Activity Waste (DFLAW) Change Order
  • 303 - Funding-FY 2015 LAWPS Funding
  • 302 - Funding-Rocky Flats Pension, Base Ops
  • 301 - Funding: FY15 Base and FY15 Capital Equipment
  • 300 - Incrementally funding Rocky Flats Pension and Benefits Administration by $12,000,000 and $100,000 for Request for Services number 9PD901 for WRPS support of the ORP building maintenance.
  • 299 - Change Order for WRPS support for the Waste Treatment and Immobilization Plant (WTP) Operability Support for Fiscal Year (FY) 2015
  • 298 - NTE Increase of $12M for AY-102 change Order
  • 297 - NTE Increase of $15M for A/AX change Order
  • 296 - Undistributed Budget Deletion.  Net change in contract value is ($79,832,274)
  • 295 - NTE Increase for Effluent Treatment Facility Turnover Preparation
  • 294 - NTE Increase for LAW Design and Operability Review
  • 293 - Funding-Base Funding, WTP Funding, ATL Supplies
  • 292 - Change Order-AN Water Flush with NTE of $500K
  • 291 - DFLAW Not to Exceed value increase of $4M
  • 290 - Not to Exceed increase for the SST Intrusion Mitigation work from $1.75M to $2.45M
  • 289 - Change Order for ETF Heat Exchanger with Not to Exceed of $1.1.
  • 288 - FY15 PEMP
  • 287 - Funding-Base funding, Capital Equipment, IEWO M47RF0005
  • 286 - Not to Exceed Increase for DOE O 414.1D, Quality Assurance from $600K to $1.4M
  • 285 - Change Order-IDF-PA with Not to Exceed of $732,000
  • 284 - Change Order for the IDF-PA with Not to Exceed of $67,000
  • 283 - Not to Exceed Increase, AY-102 Phase 2 from $12.5M to $24.9M.
  • 282 - Not to Exceed Increase A/AX of $12.5M for a total Not to Exceed value of $24.9M.
  • 281 - Not to Exceed increase for SST intrusion Mitigation of $750K
  • 280 - FY 2014 $520M PEMP
  • 279 - Not to Exceed Increase AP Exhauster Refurbishment and Installation
  • 278 - Not to Exceed Increase WTP LAW Design Review
  • 277 - Not to Exceed increase for C-107 Third Technology of $3.64M
  • 276 - Not to Exceed increase for SST intrusion Mitigation of $1M
  • 275 - A/AX NTE increase from $7M to $10M
  • 274 - Clean Up Modification -Whistleblower Clause, Section J.2 updates, Section J.13 and J.14 updates.
  • 273 - Change Order WSCF Closure
  • 272 - Obligate Incremental Funds
  • 271 - Change Order-Low Activity Waste Commissioning Strategy Review
  • 270 - A/AX NTE increase from $4M to $7M
  • 269 - ETF Turnover Preparation
  • 268 - Ay-102 Phase 2 NTE Increase
  • 267 - LAW Design Review foe WTP
  • 266 - Deletion of UB Scope-Phase 1 of 4
  • 265 - Funding-Base Ops, Rocky Flats and Mount Pension, LAW Design Review, and Capital Equipment
  • 264 - Change Order SST Intrusion Mitigation
  • 263 - Change Order C-107 3rd Technology
  • 262 - LAWPS NTE Increase of $2M
  • 261 - CBDPP Revision 2(a) NTE Increase
  • 260 - Change Order for AP Exhauster Upgrades
  • 259 - Definitization of AZ-301, Partial Stop Work, and CH TRU Charge Orders
  • 258 - Funding-Base Operations, Capital Equipment, LAW, ATL Supplies
  • 257 - Funding re-cast to change funding from one-year funding to multi-year funding.
  • 256 - Funding-Base Operations, Capital Equipment, LAW, ATL Supplies
  • 255 - Funding modification in the amount of $40,450K. Obligated as follows: $39,000K for FY14 Base Funds, $250K for FY14 ATL Supplies, and $1,200 for FY14 Capital Equipment)
  • 254 - Change Order-DST Annulus Video Inspections with NTE of $750K
  • 253 - Change Order-AY-102 Recovery Pumping and Execution Plan with $3.5K NTE
  • 252 - NTE increase in the amount of $1,208K, from $3,092 to $4,300K for the WTP HLW Design Review
  • 251 - Change Order-A and AX Next Nine Tanks, NTE of $4M
  • 250 - Change Order-WTP 4LAW with an NTE of $2.5M
  • 249 - Change Order-DOE O 414.1D and NQA-1 2008 (with 2009 addendum) with an NTE of $600,000
  • 248 - Change Order-Interim Pretreatment System AWA with a $3.5M NTE.
  • 247 - Funding-FY14 Base Funding, Capital Equipment, and ATL Supplies
  • 246 - Funding-Base Operations and WTP HLW Design Review
  • 245 - Change Order-CBDPP DOE-0342, Revision 2 with $285K NTE
  • 244 - Update Section J.2-Add DOE/RL 2002-12 Rev 1, Hanford Radiological Health & Safety
  • 242 - Funding Mod-Obligates FY14 Base Funding, Rocky Flats Administration funding and Capital Equipment funding. De-obligates FY07, FY09 and FY12 TD&D funding.
  • 241 - Increase NTE for AZ-301 Condensate Tanker Actions by $400,000.
  • 240 - Funding-Obligate $20,000 for IEWO 207527, De-obligate ($2,829.87) for IEWO 201318 and ($2,357.45) for IEWO 200242. Total net obligation of $14,812.68.
  • 239 - Funding-HLW Design Review
  • 238 - Funding-FY14 Base Funding and Capital Equipment
  • 237 -
  • 236 - Definitize 3 change orders -DF HLW Business Case Opt 2, Deep Sludge Planning & Testing, DNFSB Implementation 2010-2
  • 235 - Add J.16 Government Furnished Property List and Revise Section C to include current versions of DOE Orders that were added in previous mods (to Section J.2)
  • 234 - Increase NTE AY-102
  • 233 - Exercise Option Period 1 and add FY 2014 PEMP
  • 232 - Revise Option 1 Period Contract Price
  • 231 - Revise Base Period Contract Price
  • 230 - Funding Modification
  • 229 - Change Order NTE increase for WTP Design Review, Deep Sludge Planning, and AZ-301 Condensate Tanker
  • 228 - Add Cost and Fee for C-105 Dome Cut; CBDPP CAP, LAW Business Case and DOE Order 206.1
  • 227 - Increase NTE for AZ-301 Condensate Tanker Actions (Mod 200) by $125K
  • 226 - Funding - Spares
  • 225 - Increase the NTE for the Deep Sludge Change Order
  • 224 - Funding-Base Operations RFS #9PD901, High Level Waste design review, and Rocky Flats Administration
  • 223 - Change Order for TRU project planning
  • 222 - Change Order for AY-102 Recovery/Pumping Plan
  • 221 - Change Order for Option 2 Direct Feed High Level Business Case
  • 220 - Change Order to add scope for balance of FY2013
  • 219 - Change Order to add DOE Order 206.2 Cyber Security Requirements
  • 218 - Definitize costs and fee for FY 2009-2012 for the TOC "reconciliation" and the price was based in total incurred costs
  • 217 - Funding-IEWO 201318
  • 216 - Update Contract Section H, I, and J
  • 215 - Increase NTE for HLW Business Case Change Order by $200,000
  • 214 - Funding Base Operations
  • 213 - Funding Base Operations
  • 212 - Change Order AY102
  • 211 - Update J.8 Advance Understanding
  • 210 - Funding for Pensions and Inter Entity Work Order Number 195747
  • 209 - Add special H Clause H.51 on Conference Requirements
  • 208 - PEMP Update
  • 207 - Funding for Base Operations
  • 206 - Increase Not to Exceed value for the High Level Business Case Analysis Change Order
  • 205 - Increase NTE for C-105 Dome Cut Testing
  • 204 - Update the J.2 Table
  • 203 - Add costs and fee for C-105 Dome Cut, LAW Business Case Analysis, and CBDPP CAP and delete costs and fee for DOE O 206.1 Privacy Program.
  • 202 - Funding-Pension and IEWO 201318
  • 201 - Funding-IEWO, Base Operations and Pension
  • 200 - Change Order - C-105 Dome Cutting
  • 199 - Funding-IEWO with PNNL
  • 198 - Update Section J.3
  • 197 - Change Order-Flow Measurement Testing
  • 196 - Change Order-HLW Business Case Analysis
  • 195 - Update B.4 Table-Correct errors from previous modifications and change format of B.4 Table.
  • 194 - Funding-Obligate Mound & Rocky Flats Post Retirement Pension and Benefits
  • 193 - Funding-De-Ob Mound & Rocky Flats Post Retirement Pension and Benefits
  • 192 - Change Order-SX Barriers
  • 191 - Increase NTE for Direct LAW Feed Analysis Team
  • 190 - Funding-Base Operations, RF and Mound Pension and Benefits
  • 189 - Update Contract Sections C, I and J
  • 188 - Increase Not to Exceed Value for Direct LAW Feed Change Order by $140,000
  • 187 - Change Order-Direct LAW Feed Analysis Team
  • 186 - Add Costs and fee for DNFSB 2010-2 and TPA Milestones
  • 185 - Incremental Funding- FY13 Base Operations
  • 184 - Incorporate FY13 Award Fee Plan
  • 183 - Funding-Base Operations
  • 182 - Increase NTE for DNFSB 2010-2
  • 181 - Incremental funding: P&B Mound and Rocky Flats Administration. De-obligation of funds for WTP RFS 0WTP01 and WTP PS FY11
  • 180 - Incremental base Funding, Mound Pension funding; NTE Increase of $401,500 to DNFSB 2010-2; De-ob TDD funding and Mound and RF Admin Funds.
  • 179 - Change Order-NEPA Analysis Documentation
  • 178 - Add costs and fee for the WIPP, DST Ventilation Upgrades, Waste Transfer System, and EO 13514.
  • 177 - Funding-Base Operations, P&B Rocky Flats Pension, Mound Administration, and Rocky Flats Administration.  Funding de-obligation for HEWT
  • 176 - Update to PEMP
  • 175 - Update Sections H and J
  • 174 - Add funding for the Pacific Northwest National Laboratory abrasive materials and Technetium Speciation, P&B Mound Pensions, P&B Mound Post Retirement Benefits, P&B Mound Administration, Technology Development and Deployment (TD&D) Waste Pretreatment (WP)-0, WP-1, and WP-4.
  • 173 - TD&D Funding, De-obligate TD&D and P&B Pension Funds
  • 172 - Change WFO Code for IEWO Number 116781 With Idaho National Laboratory
  • 171 - Add Funding for the Mound and Rocky Flats Pension
  • 170 - Funding Recast
  • 169 - Clean up modification Section C, H, J.2 and J.3
  • 168 - Incremental Funding for Base Operations, TD&D and WP-5
  • 166 - Increase the not to exceed value for the DNFSB implementation plan
  • 167 - Update to PEMP
  • 165 - Increase the Not to Exceed (NTE) value of the Double Shell Tank Primary Ventilation System Upgrade to Safety Significant
  • 164 - Change Order - Begin Work on 241-AY-102 Waste Feed Delivery System
  • 163 - Add Costs and Fee for PEP and NPA
  • 162 - Incremental Funding
  • 161 - Changing Program Codes for Appropriation Year 1012
  • 160 - Funding-Base, WP-5, and Pension
  • 159 - Update Section C to Add Language for the "One System" approach (integration with WTP)
  • 158 - Add Costs and Fee for Reconciliation of CLINs 3.4, 4.1, 4.2, 4.3, 4.4
  • 157 - Increase NTE for PEP by $300,000
  • 156 - Funding-Base Operations
  • 155 - Incremental Funding - Mount Pension Fund
  • 154 - Change Order - Increase of NTE for Pretreatment Engineering Platform
  • 153 - Incremental Funding
  • 152 - Change Order - Increase of NTE for DNFSB 2010-2
  • 151 - Update to Section J-4, PEMP
  • 150 - Update to Section B - Correction to Contract Value
  • 149 - Incremental Funding
  • 148 - Change Order - DST Ventilation Systems Upgrade
  • 147 - Update to Section J-4, PEMP
  • 146 - Incremental Funding
  • 145 - Change Order Increase of NTE for Pretreatment Engineering Platform
  • 144 - Incremental Funding
  • 143 - Change Order - DNFSB 2010-2
  • 142 - Updates to Section J-4, PEMP
  • 141 - Incremental Funding
  • 140 - Incremental Funding for Rocky Flats Pension Funds
  • 139 - Incremental Funding
  • 138 - Updates to Section H.15, J.2, J.13, J.14
  • 137 - Incremental funding - Base Operations
  • 136 - Incremental funding - TDD
  • 135 - Add costs and fee for CBDPP CAP
  • 134 - Change Order - NPH Phase 2
  • 133 - Change Order and Work Authorization for CLIN 4.5 (WIPP Permits only)
  • 132 - De-obligate TDD funds from WP-1, WP-4, and ATL Rotary
  • 131 - Add costs and fee with System Plan 6 and Safety Significant Equipment
  • 130 - Funding - IEWO with SRS
    129 - Funding TDD, Operations WTP Support
  • 128 - Update PEMP, Update B.4 Table and add FAR 52.222-54
  • 127 - De-obligate funding from Rocky Flats Pension Fund per HQ request
  • 126 - Add costs and fee for DDDIF 116-Singe Shell Tank Integrity
  • 125 - Incremental Funding of $30,000,000 for Rocky Flats and Mound Pension
  • 124 - Change Order for Pretreatment Engineering Platform
  • 123 - Add costs and fee for DDDIF 138-Base Labor Rates
  • 122 - Funding - TDD
  • 121 - Funding - Base Operations $50,000,000
  • 120 - Obligation of funds for inter-agency work order with Idaho Office
  • 119 - De-obligating WRPS TDD funds from WP-5 Increased Waste Loading
  • 118 - Add costs and fee for criticality safety, NPHA, and DST Ventilation. Add DOE O 252.1A at no cost
  • 117 - Obligate funding for RFS
  • 116 - De-obligate funding for SPARES and re-obligate funding for WP-5, WP-0, and WP-1
  • 115 - Insert B-14