Contract No. DE-AC27-08RV14800
- 676 - Section J, Attach J.2 Revise DOE Orders
- 674 - Section B Funding
- 673 - Section J, Attachment J.2 – Incorporate DOE O 471.6, Chg.3 and DOE O 550.1, Chg. 1
- 672 - Section J, Attachment J.8 – Adv Understanding of Cost for winter protective clothing
- 671 - Sections H.15 – Key Personnel Update
- 670 - Sections B Funding
- 669 - Contract Sections B and J.4 – FY 22/23 PEMP Rev. 2 Incorporation; removal of J.17 Table
- 668 - Sections B - Funding
- 667 - Update Sections H, J.2, and J.10
- 666 - NTE for FY 22/23 Increased Baseline scope
- 665 - Incremental Funding - Revise Section B
- 664 - Revise Section J.3.a
- 663 - FY 22/23 Contract Extension – Sections B, J, and J.17
- 662 - Sections J.8 – COVID-19 Admin Leave for Booster Shots
- 661 - Incremental Funding - Revise Section B
- 660 - Revise Section C, Section H, and Section J.2
- 659 - Contract Section J, Attachment J.8 – COVID-19 Administrative Leave to Accompany Family Members to Receive Vaccine
- 658 - Definitize 242A Boiler Annex - revise Section B and Section C
- 657 - Contract Section J, Attachment J.4 – FY 22/23 PEMP Rev. 1
- 656 - Update Section I and J.2 – Admin Mod
- 655 - Update Section J.3 – Revised Tables 37 and 38
- 654 - Section B – Incremental Funding
- 653 - Section I – Add FAR 52.223-99 Ensuring Adequate COVID-19 Safety Protocols for Fed Contractors (Oct 2021)(Deviation)
- 652 - Definitization of 200 West Area Analysis of Alternatives
- 651 - NTE increase for 242-A Boiler Annex
- 650 - Section J, Attachment J.4 FY 22/23 PEMP Rev 0 and Attachment J.17 Post FY Cost & Fee
- 649 - Section B - Funding
- 648 - NTE Increase for 200W Area Analysis of Alternatives
- 647 - Sections H key personnel & J.3a interface matrix updates
- 646 - Update Section C – Removal of 222-S Laboratory Work Scope
- 645 - Sections B & F – FY 22/23 Extension NTE and POP extension
- 644 - Section B and J.4 – PEMP Rev. 3 Incorporation
- 643 - Section B and J.17 – FYs 17-20 Fee Reconciliation
- 642 - Section B - Incremental Funding
- 641 - Definitization of 222-S Lab Descope and TBI
- 640 - Section B – Incremental Funding
- 639 - NTE Increase for 242-A Boiler Scope
- 638 - Section J, Attachment J.8 Updates – COVID-19 Vaccination Side Effects Admin Leave Authorization
- 637 - Section J, Attachment J.4 PEMP Revision 2 and Section B, B.4-1 Table Update
- 636 - COVID REA
- 635 - Section H.11 Workforce Restructuring
- 634 - Increase contract value for Fire Protection Program Expansion
- 633 - Administrative Mod to correct error on obligation amount on Mod 631 Continuation page
- 632 - Contract Sections H and I updated
- 631 - Incremental funding Mod and update Contract Section B, Supplies or Services and Prices/Costs
- 630 - Contract Sections J, Attachment J.6 Subcontracting Plan update
- 629 - Definitize TX – Barrier and update Contract Section B, Supplies or Services and Prices/Costs
- 628 - Section B Funding
- 627 - NTE for West Area Analysis of Alternatives
- 626 - Update Section G and J.2
- 625 - NTE for 242-A Boiler Scope
- 624 - Section B - Funding De-obligation for Legacy Pensions and Benefits Scope
- 623 - Contract Sections C and H – Legacy Pensions and Benefits scope revision
- 622 - NTE Increase for 241-TX Tank Farm Barrier
- 621 - Section B – Incremental Funding
- 620 - Section J, Attachment J.8 Updates – COVID-19 Vaccination Admin Leave Authorization
- 619 - Section J, Attachment J.3a Updates
- 618 - Not to Exceed for Low Level Waste Offsite Disposal FY21 Scope
- 617 - Incorporate DOE Order 442.1B, DOE Employee Concerns Program
- 616 - Incorporate FY 2021 PEMP Rev. 1 into Attachment J.4 and Section B
- 615 - Definitization FY 2021 Contract Extension
- 614 - Section H – Revised Clause H.61 for CARES Act Extension
- 613 - Definitization of WTP Spare Parts - Section B and J Attach 17
- 612 - Section B Funding
- 611 - Section J, Attachment J.10 – Updated Wage Determinations
- 610 - Section J.3a and J.13 updates
- 609 - Revise Clause H.2 - HEWT
- 608 - Section H and J.5 – Updated CORs, Key Personnel & Performance Guarantee Agreement
- 607 - Incremental Funding
- 606 - NTE for WTP Spare Parts Acquisition
- 605 - Section J – Updated Small Business Subcontracting Plan
- 604 - Incremental Funding
- 603 - Section H – Revised H.61 Clause CARES Act
- 602 - Section H – Revised H.61 Clause CARES Act
- 601 - Section H - Revised H.61 Clause CARES Act
- 600 - Section B - Incremental Funding (includes COVID-19)
- 599 - Section H – Revised COR Listing
- 598 - Section B – Incremental Funding
- 597 - Section J.2 Admin CRD
- 596 - Section J, Attach J.2 – DOE Order 486.1A
- 595 - NTE for 241-TX Barrier
- 594 - Incremental Funding
- 593 - Definitize Effluent Treatment Facility
- 592 - Section B Funding & Section G Contract Administration
- 591 - Incremental Funding
- 590 - Extend CARES Act & Revise effective date in clause H.61
- 589 - Expiration of Partial Stop Work Order
- 588 - Section J.4, PEMP_Add FY21
- 587 - TSCR Demo Subproject Deletion
- 586 - Funding Mod
- 585 - FY20 PEMP Revision 3
- 584 - FY21 Contract Extension and NTE_Updates to Sections B, C, and F
- 583 - Funding Mod
- 582 - Definitization of LLW Offsite Disposal
- 581 - Incremental Funding (includes COVID-19)
- 580 - Incremental Funding (includes COVID-19)
- 579 - Definitization Change Order for LERF DSA
- 578 - Section B – Incremental Funding
- 577 - Partial Stop Work Order Extension
- 576 - Incremental Funding and update Attachment J.9 Special Financial Institute Account Agreement
- 575 - Partial Stop Work Order Extension
- 574 - FY20 PEMP Revision 2
- 573 - Section B – Incremental Funding
- 572 - Section H Update, update COVID 19 CARES Act Clause
- 571 - Definitization of TSCR Demonstration Project Additional Filter Testing
- 570 - Section B Incremental Funding
- 569 - Section H Update, add COVID 19 CARES Act Clause
- 568 - Sections, F, H & J.6 – Admin Mod
- 567 - Section B – Incremental Funding
- 566 - NTE for Effluent Test Facility Additional FY20 Work Scope
- 565 - Definitization of Undistributed Budget Deletions
- 564 - Section B – Incremental Funding
- 563 - NTE for TBI Low-Level Waste Offsite Disposal
- 562 - Section B – REA SX Barrier Vapor Impacts
- 561 - Section B – Incremental Funding
- 560 - Section J.3 – Hanford Site Services and Interface Requirements Matrix
- 559 - Section B – Incremental Funding
- 558 - Section B – Incremental Funding
- 557 - Section B – Incremental Funding
- 556 – Definitization of FY20 Contract Extension, FY20 Additional Work Scope and PEMP Rev. 1
- 555 – Section B – Incremental Funding
- 554 - Section B updates and Definitization of Cyber Security and LERF Basin 41
- 553 - Section B – Incremental Funding
- 552 - Section J.10 – Wage Determination
- 551 - Section J.13 & J.14 Updates
- 550 - NTE Increase for FY20 Contract Extension
- 549 - Incremental Funding
- 548 - Incremental Funding
- 547 - NTE Increase for FY20 Contract Extension
- 546 - Section B - Incremental Funding
- 545 - Section B – Incremental Funding
- 544 - Section J.4, PEMP_Add FY20
- 543 - FY20 Contract Extension and NTE_Updates to Sections B, C, and H
- 542 – Section B updates and Definitization of LAWPS, VSL, & WTP Spare Parts
- 541 – Section Updates to H, J.2, J.3 and J.10
- 540 - FY19 PEMP Revision 2
- 539 - ACES to SENTINEL Definitization
- 538 - Section B - Incremental Funding
- 537 - Procurement Staging Package FY20 Definitization
- 536 - Test Bed Initiative Phase 2 Definitization
- 535 - Section B – Incremental Funding
- 534 - Additional Appropriations Phases 1 and 2 Definitizations
- 533 - Disposition of Glass Containers Definitization
- 532 - Section B – Incremental Funding and Section J, Attach J.9 – Financial Agreement
- 531 - First 2,000 Gallon Test Bed Initiative Definitization
- 530 - Tank Farm Upgrades II Definitization
- 529 – FY20 Acceleration Definitization
- 528 – NTE Increase for TBI Phase 2_SY-101 Farm
- 527 – Section B – Incremental Funding
- 526 – Section B – Incremental Funding and Funding Correction
- 525 – Section B – Incremental Funding
- 524 – FY19 PEMP Revision 1
- 523 – Section B Funding Correction
- 522 – Section B – Incremental Funding
- 521 – Section B – Incremental Funding
- 520 - Update Section H.57, List of CORs
- 519 - Updates to Section I and J.6
- 518 - Section B - Incremental Funding
- 517 - NTE Increase for Tank Farm Upgrades II
- 516 - Incorporate cost and fee for Tank Farm 242-A Evaporator PB-1 and PB-2 pump replacement change proposal CP-18-017
- 515 - Administrative Mod to Correct Mod 514
- 514 - Section B - Incremental Funding
- 513 - Section B - Incremental Funding
- 512 - Section B - Incremental Funding
- 511 - TBI and ACES Sentinal NTE
- 510 - Definitize the CH TRU Project Planning Effort
- 509 - Section B - Incremental Funding
- 508 - Definitize four contract changes for TF Upgrades to Support DFLAW, AY-102 Phases 3 & 4, SX Barrier Expansion Construction, and Fire Alarm Panel Upgrades
- 507 - NTE for Tank Farm Upgrades II
- 506 - Update Section B
- 505 - TOC One-Year Contract Extension Through FY2019
- 504 - Section B - Incremental Funding
- 503 - Wage Determination Update and add 52.222.62
- 502 - FAR 52.243-22 Changes - Cost Reimbursement
- 501 - Section B – Incremental Funding
- 500 - FAR 52.243-22 Changes - Cost Reimbursement
- 499 – LAWPS De-Obligation
- 498 - FY19 PEMP
- 497 - NTE Increase for AY 102 Phases 3 & 4
- 496 - Section B - Incremental Funding
- 495 - Section B - Incremental Funding
- 494 – NTE Increase for LAWPS
- 493 - FY 18 PEMP Revision 2
- 492 - Definitization of REA for Vapor Impacts on DST Work Scope & Execution
- 491 - Section B - Incremental Funding
- 490 - NTE Increase for Test Bed Initiative
- 489 – Section B - Incremental Funding
- 488 – Section B - Incremental Funding
- 487 – Definitization of CVAP KPPs
- 486 - Change Order Annulus, Transfer Lines, SX Barrier, WTP Transition Support
- 485 – Section B - Incremental Funding
- 484 – Definitization of PSSD for ILAW Container
- 483 – Section B - Incremental Funding
- 482 - Section B – Incremental Funding
- 481 – NTE for ILAW Transporter Testing
- 480 – FAR 52.243-2 Changes - Cost Reimbursement
- 479 - Definitize PUREX Tunnel Event Request
- 478 - Definitize Field Lysimeter Test Facility
- 477 - NTE Increase – CVAP KPPs
- 476 - Section B - Incremental Funding
- 475 - NTE Increase- Tank Farm Upgrades to Support DFLAW
- 474 - Update Sections H, J.2, J.6 and J.10
- 473 – Section B - Incremental Funding
- 472 - Section B – Incremental Funding
- 471 – Section B - Incremental Funding
- 470 – Section H Updates
- 469 - NTE Increase for WTP Transition Support
- 468 – Section B - Incremental Funding
- 467 – NTE Increase for 222-SA Cold Lab Design
- 466 - Section B - Incremental Funding
- 465 - Section B - Incremental Funding
- 464 - FY 18 PEMP Revision 1
- 463 - Section B - Incremental Funding
- 461 - Infrastructure Support Costs (MSA J3 Services)
- 460 - NTE Increase for Package Specific Safety Document for Immobilized Low-Activity Waste Container
- 459 - NTE Increases for CVAP KPPs and SX Barrier Expansion Design
- 458 - Section B – Incremental Funding
- 457 - NTE Increase Tank Farm Upgrades to Support DFLAW
- 456 - NTE Increase AY-102 Phase 3
- 455- Section J.2 - Requirement Sources and Implementing Documents
- 454 - FY 2018 PEMP
- 453 - Update Sections B, C, H, I, J2, J6,
- 452 - Section B – Incremental Funding
- 451 - Section J.2 – DOE Order 232.2A, Occurrence Reporting and Processing of Operations Info
- 450 - NTE for the WTP Transition Support and Incremental Funding
- 449 - Section B – Incremental Funding
- 448 - 222-SA Cold Lab Design Only Definitization
- 447 - Section B – Incremental Funding
- 446 - Delete Mod 440 and de-obligate funds
- 445 - NTE Increase for FY17 Buyback New Scope
- 444 - NTE Increase for CVAP KPPs
- 443 - NTE Increase for AY-102 Phase 3
- 442 - Section B – Incremental Funding
- 441 - FY 2017 PEMP Update
- 440 - NTE for WTP Transition Support
- 439 - Vapors-Impacted Work Scope Not Previously Negotiated
- 437 - Section J, Attachment J.10 – Wage Determinations – Service Contract Act and Davis Bacon Act
- 436 - Section B - Incremental Funding
- 434 - FAR 52.243-2 Changes - Cost Reimbursement
- 433 - Definitization ETF IQRPE
- 432 - Section B – Incremental Funding
- 431 - Section B - Incremental Funding
- 430 - Section B, J.2; FAR 52.243-2 Changes - Cost Reimbursement
- 429 - Section B - Incremental Funding
- 428 - Section B - Incremental Funding
- 427 - FAR 52.243-2 Changes - Cost Reimbursement
- 426 - NTE Increase for AY-102 Phase 3
- 424 - NTE for Package-Specific Safety Document for ILAW Container
- 423 - NTE for the LAWPS Design Maturity Increase
- 422 - Price reduction WTP Design Operability
- 421 - Section H Updates
- 420 - Definitization of 242-A Spare Reboiler and 242-A DSA Upgrades
- 419 - Section B - Incremental Funding
- 418 - Not to Exceed for AY 102 Phase III
- 417 - Section B - Incremental Funding
- 416 - Not to Exceed for C-105 Third Technology
- 415 - Section B - Incremental Funding
- 414 - Updates to Sections C, H-52, J, J.3, J.9 & J.10
- 413 - Not to Exceed for IQRPE
- 412 - Section B - Incremental Funding
- 411 – Section B – Incremental Funding
- 410 – NTE for LAWPS Safety Design Strategy
- 409 – NTE for C-105 Sluicing Alternative – 3rd Technology
- 408 – Definitize LAW Radioactive Test Bed Change Order
- 407 – Section B – Incremental Funding
- 406 – NTE 222-SA Cold Lab Construction Bid Process
- 405 - Definitization of Option Period
- 404 - Contract Section J.4, 2017 PEMP
- 403 - Contract Section J.4, Update 2016 PEMP
- 402 - FY 2016 PEMP Update
- 401 - Definitize Vapor Implementation Plan Phase 1
- 400 - NTE Increase for LAW Radioactive Test Bed
- 399 – NTE Increase for 222-SA Cold Lab Design
- 398 - Infrastructure Support Costs and Caustic Recycle conceptual design effort
- 397 - NTE Increase for 242-A Evaporator Re-Boiler Design and Fabrication
- 396 - NTE for LAW Radioactive Test Beds
- 395 - Funding for BPA, WRPS 2016, WRPS Spares, Lab Equipment, ETF Spares & Reallocate BPA Reimbursement to WRPS
- 394 - Update Section J – Subcontracting Plan Narrative Updates
- 393 - Definitization ETF Upgrades and Operations
- 392 - NTE for 242-A Evaporator Reboiler
- 391 - Updates to Sections H & I
- 390 - NTE Increase for 222-SA Cold Lab Design
- 389 - Obligate Incremental Funds
- 388 - Updates to Section J.3 and J.4_PEMP Changes
- 387 - Definitize change proposal number CP-15-016 (WRPS-1503639 R2, dated December 17, 2015) for the LAWPS Advance Conceptual Design and incorporate the statement of work.
- 386 - Definitization of FY16 Vapors Impacts
- 385 - Obligate Incremental Funds
- 384 - Funding for Rocky Flats and Mound Pensions and Benefits Administration
- 383 - NTE Increase for ETF Upgrades & Operations
- 382 - Updates to Contract Sections J and J.3
- 381 - Funding for Low Activity Waste Radioactive Test Beds
- 380 - Funding – WRPS 2016, WRPS Spares, LAWPS Capital, Lab Equipment & WAI Supplies
- 379 - NTE Increase for C-105 Third Technology
- 378 - Increase the NTE for the Chemical Vapors Implementation Plan
- 377 - NTE Increase for 222-SA Cold Lab Design
- 376 - Obligate Incremental Funds
- 375 - NTE for LAWPS Updated Design Direction
- 374 - NTE Increase - ETF Upgrades and Operations
- 373 - Definitization the Chemical Vapors impacts for Fiscal Year 2015
- 372 - Funding – WRPS 2016, Spares, and LAWPS
- 371 - Update Contract Sections C, I, J.2, and J.9
- 370 - Update Section H
- 369 - Funding - LAWPS Capital and 2008 Tank Farms
- 368 - NTE for 222SA
- 367 - NTE Increase for ETF Upgrades & Operations
- 366 - NTE for LAWPS Updated Design Direction
- 365 - Funding
- 364 - Definitization for 420.1C, Lockout/Tagout Procedures Rev.2, Re-Configured Isolok Testing, & DNFSB-2012-2 Ductwork Mod
- 363 - NTE for Caustic Recycle Scope Definition
- 362 - Funding – Deobligation of PD Funds
- 361 - Obligate Incremental Funds
- 360 - Upda ted Key Personnel & CORs
- 359 - Definitization of C-107 3rd Technology, AN Water Flush System, ETF Heat Exchanger Replacement, Fall Protection Program Rev 1A, White Bluffs 10-Wide Mobile Facility and Gable 10-Wide Mobile Facilities
- 358 - Obligate Incremental Funds
- 357 - NTE Increase – Isolok Accuracy Testing
- 356 - Funding for Rocky Flats Admin
- 355 - Definitization of AY-102
- 354 - Update Contract Section H
- 353 - Funding-IEWO M47RF0005
- 352 - Funding-2016 Base Funds, LAWPS, Capital Equipment, 222-S Lab Supplies
- 351 - Funding-2012, 2013, 2014 and 2015 Base Funding
- 350 - Incorporate FY16 PEMP
- 349 - Update FY15 PEMP, PBI 11.2
- 348 - Definitization of AP Farm Ventilation Upgrades
- 347 - Funding-Base Operations
- 346 - Funding-Spares, Work for Others, Base Operations
- 345 - Definitization of Vapors CAP, DOE 414.1D, WTP FY15 Support, IDF PA, ETF Transition
- 344 - Funding-Base Funding
- 343 - Definitization of Relocation costs, ETF Turnover Prep, 13.8kV Line Upgrade, C-101 and C-112 3rd Technology, LAW Design Review, and 222-S Lab Room Upgrade
- 342 - Funding-Base Ops and LAWPS
- 341- NTE Increase 222-S Lab Room Upgrades
- 340- Funding-Base Ops, Rocky Flats and Mound Pension, LAW Design Review, and Capital Equipment
- 339- NTE Increase ETF Heat Exchanger
- 338 - NTE Increase AP Farm Ventilation Upgrades
- 337- Definitization of Integrated Test Facility
- 336- NTE Increase IDF PA
- 335- NTE Increase AP Farm Ventilation Upgrades
- 334- Definitization of several contract changes
- 333 - NTE Increase of $250k for 222-S Lab Room 1GB Upgrade
- 332 - A/AX Definitization
- 331 - FY2015 PEMP Update
- 330 - Update Contract Sections C, G, H, I and J
- 329 - Change Order-DOE O 420.1C, Facility Safety, for LAWPS
- 328 - Change Order-LAWPS Integrated Testing
- 327 - Change Order-Isolek Accuracy Testing
- 326 - Funding-Base Operations, Capital Equipment, LAWPS
- 325 - Change Order-DNFSB 2012-2 Ductwork
- 324 - Change Order-Trailer Building #2
- 323 - Change Order-Trailer Building #1
- 322 - Definitization of DNFSB 2012-2, Part 2, Small Scale Solids Delivery Testing and SSST Intrusion Mitigation cost and fee
- 321 - NTE Increase of $250K for 222-S Lab Room 1GB Upgrade
- 320 - NTE Increase of $740K for IDF PA
- 319 - Change Order to begin implementation of the U.S. Department of Energy (DOE) Order (O) 420.1C, Facility Safety
- 318 - Funding-Base Operations, Mound Pension, LAWPS
- 317 - Office of River Protection (ORP) Tank Vapors Assessment Team (TVAT) recommendations Not to Exceed value increase
- 316 - ETF Operations NTE Increase
- 315 - Funding
- 314 - Change Order C-105 Third Technology
- 313 - ETF Transition Support NTE Increase
- 312 - AY-102 Phase 2 NTE Increase
- 311 - NTE Increase of $250K for IDF PA
- 310 - Definitization of DFLAW, Small Scale Liquid Testing and DNFSB 2012-2
- 309 - TVAT Change Order and NTE Authorization
- 308 - LAWPS NTE Increase
- 307 - Funding-Pensions
- 306 - NTE Increase of $400K for 222-S Lab Room 1GB Upgrades
- 305 - Change Order for the Effluent Treatment Facility Transition Support costs.
- 304 - To Definitize Direct Feed Low Activity Waste (DFLAW) Change Order
- 303 - Funding-FY 2015 LAWPS Funding
- 302 - Funding-Rocky Flats Pension, Base Ops
- 301 - Funding: FY15 Base and FY15 Capital Equipment
- 300 - Incrementally funding Rocky Flats Pension and Benefits Administration by $12,000,000 and $100,000 for Request for Services number 9PD901 for WRPS support of the ORP building maintenance.
- 299 - Change Order for WRPS support for the Waste Treatment and Immobilization Plant (WTP) Operability Support for Fiscal Year (FY) 2015
- 298 - NTE Increase of $12M for AY-102 change Order
- 297 - NTE Increase of $15M for A/AX change Order
- 296 - Undistributed Budget Deletion. Net change in contract value is ($79,832,274)
- 295 - NTE Increase for Effluent Treatment Facility Turnover Preparation
- 294 - NTE Increase for LAW Design and Operability Review
- 293 - Funding-Base Funding, WTP Funding, ATL Supplies
- 292 - Change Order-AN Water Flush with NTE of $500K
- 291 - DFLAW Not to Exceed value increase of $4M
- 290 - Not to Exceed increase for the SST Intrusion Mitigation work from $1.75M to $2.45M
- 289 - Change Order for ETF Heat Exchanger with Not to Exceed of $1.1.
- 288 - FY15 PEMP
- 287 - Funding-Base funding, Capital Equipment, IEWO M47RF0005
- 286 - Not to Exceed Increase for DOE O 414.1D, Quality Assurance from $600K to $1.4M
- 285 - Change Order-IDF-PA with Not to Exceed of $732,000
- 284 - Change Order for the IDF-PA with Not to Exceed of $67,000
- 283 - Not to Exceed Increase, AY-102 Phase 2 from $12.5M to $24.9M.
- 282 - Not to Exceed Increase A/AX of $12.5M for a total Not to Exceed value of $24.9M.
- 281 - Not to Exceed increase for SST intrusion Mitigation of $750K
- 280 - FY 2014 $520M PEMP
- 279 - Not to Exceed Increase AP Exhauster Refurbishment and Installation
- 278 - Not to Exceed Increase WTP LAW Design Review
- 277 - Not to Exceed increase for C-107 Third Technology of $3.64M
- 276 - Not to Exceed increase for SST intrusion Mitigation of $1M
- 275 - A/AX NTE increase from $7M to $10M
- 274 - Clean Up Modification -Whistleblower Clause, Section J.2 updates, Section J.13 and J.14 updates.
- 273 - Change Order WSCF Closure
- 272 - Obligate Incremental Funds
- 271 - Change Order-Low Activity Waste Commissioning Strategy Review
- 270 - A/AX NTE increase from $4M to $7M
- 269 - ETF Turnover Preparation
- 268 - Ay-102 Phase 2 NTE Increase
- 267 - LAW Design Review foe WTP
- 266 - Deletion of UB Scope-Phase 1 of 4
- 265 - Funding-Base Ops, Rocky Flats and Mount Pension, LAW Design Review, and Capital Equipment
- 264 - Change Order SST Intrusion Mitigation
- 263 - Change Order C-107 3rd Technology
- 262 - LAWPS NTE Increase of $2M
- 261 - CBDPP Revision 2(a) NTE Increase
- 260 - Change Order for AP Exhauster Upgrades
- 259 - Definitization of AZ-301, Partial Stop Work, and CH TRU Charge Orders
- 258 - Funding-Base Operations, Capital Equipment, LAW, ATL Supplies
- 257 - Funding re-cast to change funding from one-year funding to multi-year funding.
- 256 - Funding-Base Operations, Capital Equipment, LAW, ATL Supplies
- 255 - Funding modification in the amount of $40,450K. Obligated as follows: $39,000K for FY14 Base Funds, $250K for FY14 ATL Supplies, and $1,200 for FY14 Capital Equipment)
- 254 - Change Order-DST Annulus Video Inspections with NTE of $750K
- 253 - Change Order-AY-102 Recovery Pumping and Execution Plan with $3.5K NTE
- 252 - NTE increase in the amount of $1,208K, from $3,092 to $4,300K for the WTP HLW Design Review
- 251 - Change Order-A and AX Next Nine Tanks, NTE of $4M
- 250 - Change Order-WTP 4LAW with an NTE of $2.5M
- 249 - Change Order-DOE O 414.1D and NQA-1 2008 (with 2009 addendum) with an NTE of $600,000
- 248 - Change Order-Interim Pretreatment System AWA with a $3.5M NTE.
- 247 - Funding-FY14 Base Funding, Capital Equipment, and ATL Supplies
- 246 - Funding-Base Operations and WTP HLW Design Review
- 245 - Change Order-CBDPP DOE-0342, Revision 2 with $285K NTE
- 244 - Update Section J.2-Add DOE/RL 2002-12 Rev 1, Hanford Radiological Health & Safety
- 242 - Funding Mod-Obligates FY14 Base Funding, Rocky Flats Administration funding and Capital Equipment funding. De-obligates FY07, FY09 and FY12 TD&D funding.
- 241 - Increase NTE for AZ-301 Condensate Tanker Actions by $400,000.
- 240 - Funding-Obligate $20,000 for IEWO 207527, De-obligate ($2,829.87) for IEWO 201318 and ($2,357.45) for IEWO 200242. Total net obligation of $14,812.68.
- 239 - Funding-HLW Design Review
- 238 - Funding-FY14 Base Funding and Capital Equipment
- 237 -
- 236 - Definitize 3 change orders -DF HLW Business Case Opt 2, Deep Sludge Planning & Testing, DNFSB Implementation 2010-2
- 235 - Add J.16 Government Furnished Property List and Revise Section C to include current versions of DOE Orders that were added in previous mods (to Section J.2)
- 234 - Increase NTE AY-102
- 233 - Exercise Option Period 1 and add FY 2014 PEMP
- 232 - Revise Option 1 Period Contract Price
- 231 - Revise Base Period Contract Price
- 230 - Funding Modification
- 229 - Change Order NTE increase for WTP Design Review, Deep Sludge Planning, and AZ-301 Condensate Tanker
- 228 - Add Cost and Fee for C-105 Dome Cut; CBDPP CAP, LAW Business Case and DOE Order 206.1
- 227 - Increase NTE for AZ-301 Condensate Tanker Actions (Mod 200) by $125K
- 226 - Funding - Spares
- 225 - Increase the NTE for the Deep Sludge Change Order
- 224 - Funding-Base Operations RFS #9PD901, High Level Waste design review, and Rocky Flats Administration
- 223 - Change Order for TRU project planning
- 222 - Change Order for AY-102 Recovery/Pumping Plan
- 221 - Change Order for Option 2 Direct Feed High Level Business Case
- 220 - Change Order to add scope for balance of FY2013
- 219 - Change Order to add DOE Order 206.2 Cyber Security Requirements
- 218 - Definitize costs and fee for FY 2009-2012 for the TOC "reconciliation" and the price was based in total incurred costs
- 217 - Funding-IEWO 201318
- 216 - Update Contract Section H, I, and J
- 215 - Increase NTE for HLW Business Case Change Order by $200,000
- 214 - Funding Base Operations
- 213 - Funding Base Operations
- 212 - Change Order AY102
- 211 - Update J.8 Advance Understanding
-
Last Updated 05/26/2022 3:16 PM
|
|