Hanford.Gov
Documents
Hanford Hoisting and Rigging Manual

Permission has been received from the American Society of Mechanical Engineers to use and reproduce portions of standards relating to crane operation and safety. The Committee of Wire Rope Producers of the American Iron and Steel Institute grants permission to reproduce or quote their Wire Rope Users Manual and the Wire Rope Sling User's Manual when used as an editorial reference. Illustrations of lattice boom dismantling/assembly have been reproduced from the Mobile Crane Manual by courtesy of Construction Safety Association of Ontario. The Crosby Group, Inc., has granted permission to use information about wire rope clips and illustrations of swivel hoist rings and rigging techniques from The Crosby General Catalog.

For questions or comments, please send email to Patrick Vallejos

Hoisting & Rigging (HRM) Logo

Hoisting & Rigging Manual

Revision 1, Release 84

Approved Ballots

Acknowledgements

1.0 Introduction
     Effective Date: 06/19/2018 (Rel. 84)

2.0 Responsibilities
     Effective Date: 06/19/2018 (Rel. 84)

3.0 Critical, Special, & Engineered Lifts
     Effective Date: 06/19/2018 (Rel. 84)

4.0 Personnel Qualifications and Training Requirements
     Effective Date: 06/19/2018 (Rel. 84)

5.0 Hooks
     Effective Date: 06/19/2018 (Rel. 84)

6.0 Forklift Trucks
     Effective Date: 06/19/2018 (Rel. 84)

7.0 Shop Cranes
     Effective Date: 06/19/2018 (Rel. 84)

8.0 Wire Rope
     Effective Date: 06/19/2018 (Rel. 84)

9.0 Slings
     Effective Date: 06/19/2018 (Rel. 84)

10.0 Rigging Hardware
     Effective Date: 06/19/2018 (Rel. 84)

11.0 Below-The-Hook Lifting Devices
     Effective Date: 06/19/2018 (Rel. 84)

12.0 Hoists 
     Effective Date: 06/19/2018 (Rel. 84)

13.0 Overhead And Gantry Cranes; Cranes and Monorails
     Effective Date: 06/19/2018 (Rel. 84)

14.0 Mobile Cranes
     Effective Date: 06/19/2018 (Rel. 84)

15.0 Personnel Lifting
     Effective Date: 06/19/2018 (Rel. 84)

16.0 A-Frames And Trolleys
     Effective Date: 06/19/2018 (Rel. 84)

17.0 Interpretations
      Effective Date: 06/19/2018 (Rel. 84)

18.0 Reserved

19.0 Reserved

20.0 Hoisting & Rigging in Hostile Environments
     Effective Date: 06/19/2018 (Rel. 84)

21.0 References & Bibliography
     Effective Date: 06/19/2018 (Rel. 84)

Appendix A. - Definitions & Acronyms
     Effective Date: 06/19/2018 (Rel. 84)

Appendix B. - User's Guide
     Effective Date: 06/19/2018 (Rel. 84)

Attachment 1 Charter
     Effective Date: 06/19/2018 (Rel. 84)

Attachment 2 Freight Container Lifting Standard
     Effective Date: 06/19/2018 (Rel. 84)
Attachment 3 Lifting Requirements for Concrete Blocks
     Effective Date: 06/19/2018 (Rel. 84)
Attachment 4 29 CFR 1926, Subpart CC, Cranes & Derricks in Construction
     Effective Date: 06/19/2018 (Rel. 84)

 

Last Updated 08/20/2018 1:08 PM