Skip to main content
Hanford.Gov

On the Calendar

July 12, 2016
 
Event: Public Comment Period: Proposed Closure Plan for the B Plant 276-BA Organic Storage Facility
Category: Comment Period / Feedback Opportunity
Event Date: April 25 – August 6, 2016
 


The U.S. Department of Energy (DOE), Richland Operations Office (RL) plans to propose a change to Hanford’s Dangerous Waste Permit to close the 276-BA Organic Storage Facility located at the B Plant. A public meeting will be held May 17, 5:30 p.m., Richland Public Library, 955 Northgate Drive, Richland, WA 99352

The Organic Storage Facility is in the northeast portion of the B Plant Complex. The facility is a secondary containment structure and consists of two separate compartments. The east compartment contains one tank that is a permitted Treatment, Storage and Disposal Dangerous Waste Management Unit (DWMU) used to store organic mixed waste.  No waste was added to the tank at that location. The west compartment is empty and is not permitted as a DWMU. Under the closure plan, the east tank will be removed, the pad beneath it removed, and, following sampling, the DWMU will be closed.
 
The ISO-East tank currently contains less than 2 gallons of washed organic residues consisting of normal paraffin hydrocarbons (NPH), di (2 ethylhexyl) phosphoric acid (D2EHPA), and tributyl phosphate (TBP).  The tank will be disposed of as one unit at the Environmental Restoration Disposal Facility.
 
DOE will be submitting the 276-BA Organic Storage Facility Closure Plan for public comment. This closure plan will be processed as a Class 3 modification to the permit. The proposed Class 3 permit changes require a 60 day comment period led by the permittee (DOE), and a public meeting. The comment period will be followed by an Ecology led 45 day comment period on the draft permit change.
 
The DOE contact person for this permit change is Rich Buel, 509-376-3375. The Washington State Department of Ecology contact person is Stephanie Schleif, 509-372-7929. The permittees’ compliance history during the life of the permit being modified also is available from the Washington State Department of Ecology contact person.
 
During the public comment period, copies of the proposed closure plan and supporting documentation will be available at the Administrative Record, 2440 Stevens Drive, Richland, WA or online http://pdw.hanford.gov/arpir/index.cfm/viewDoc?accession=0077214H
 
A Public comment period will run from April 25 – June 24, August 6, 2016.
 
You can submit comments by June 24, August 6, 2016 to:
Stephanie Schleif
Washington State Department of Ecology
3100 Port of Benton Blvd
Richland, WA 99354
Email: Hanford@ecy.wa.gov


Fact Sheet

 

 

 

 

 

 

 
 
Select a Day
July 2016
S M T W T F S
      1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
 
Search
Search July
Search 2016




Public Involvement Meetings
Workshops / Conferences
Comment Period / Feedback Opportunity
Hanford Advisory Board
Ecology-led Event