Subcontractor Information
WRPS Documents Applicable to Subcontractors

The listed documents are routinely updated.
Contact the appropriate Buyer's Technical Representative (BTR) to verify current document revision.


HANFORD SITE WIDE DOCUMENTS

Hanford Site Lockout/Tagout Program 
DOE-0336

Hanford Site Chronic Beryllium Disease Prevention Program (CBDPP)
DOE-0342

Hanford Site Stop Work Procedure 
DOE-0343

Hanford Site Excavating, Trenching and Shoring (HSETSP)
DOE-0344

Hanford Site Fall Protection Program
DOE-0346

Hanford Site Respiratory Protection Program (HSRPP)
DOE-0352

Hanford Site Electrical Safety Program
DOE-0359

Hanford Site Confined Space Procedure
DOE-0360

Hanford Site Hoisting and Rigging Manual
DOE/RL 92-36

Preliminary Hazard Assessments

Preliminary Hazard Assessment (PHA) 31

Preliminary Hazard Assessment (PHA) 32

TFC POLICIES
  
WRPS Safety and Occupational Health
TFC-POL-14, Rev. C-9

Smoke Free Workplace
TFC-POL-29, Rev. B-2
   
Recreational Policy
TFC-POL-31, Rev. B-10
 
TFC PLANS/PROGRAMS 
   
Fire Protection Program
TFC-PLN-13, Rev. B-3
  
Industrial Hygiene Exposure Assessment Strategy
TFC-PLN-34, Rev. F-1
  
Treatment, Storage and Disposal Facility Hazardous Waste Operations
TFC-PLN-43, Rev. B-15
  
Worker Safety and Health Program
TFC-PLN-47, Rev. C-11

OPERATIONS/MAINTENANCE
   
Tank Operations Contractor Work Control
TFC-OPS-MAINT-C-01, Rev. T-5
   
Waste Planning Checklist
TFC-OPS-WM-C-01, Rev. B-2

Control of Working Hours
TFC-OPS-OPER-C-68, Rev. A-6

BUSINESS SERVICES
   
Editorial Standards and Format Guidance for Documents
TFC-BSM-AD-STD-02, Rev. D-17

Software Development, Implementation and Management
TFC-BSM-IRM_HS-C-01, Rev. H-11

Vendor Process
TFC-BSM-IRM_DC-C-07, Rev. A-21

ESHQ STANDARDS

FIRE PROTECTION
    
Controls for Safe Hot Work
TFC-ESHQ-FP-C-01, Rev. A-17
   
Fire Marshal Permits, Combustible Controls, and Construction/Occupancy Requirements
TFC-ESHQ-FP-STD-01, Rev. D-1
   
Fire Protection Design Criteria
TFC-ESHQ-FP-STD-02, Rev. D-5
   
Flammable/Combustible Liquids
TFC-ESHQ-FP-STD-03, Rev. C-7
   
Fire Protection System Inspection, Testing, Maintenance, and Discrepancies Management
TFC-ESHQ-FP-STD-04, Rev. C-8
   
Flammable Gas Monitoring
TFC-ESHQ-FP-STD-05, Rev. A-12 
   
Fire Hazard Analysis and Fire Protection Assessment Requirements
TFC-ESHQ-FP-STD-06, Rev. B-13
   
Hanford Fire Department Services
TFC-ESHQ-FP-STD-12, Rev. A-8 

Fire Protection Requirements for Hazardous Material and Used Waste Absorbing Material Storage
TFC-ESHQ-FP-STD-13, Rev. A-11

SAFETY - CASE MANAGEMENT/L&I

Injury and Illness Recordkeeping
TFC-ESHQ-S_CMLI-C-01, Rev. C-12
   
Injury and Illness Events
TFC-ESHQ-S_CMLI-C-02, Rev. D-16

SAFETY - INDUSTRIAL HYGIENE

Hazard Communication
TFC-ESHQ-IH-C-02, Rev. B-2
   
Respiratory Protection
TFC-ESHQ-IH-STD-07, Rev. A-2

Heat Stress Control
TFC-ESHQ-IH-C-07, Rev. B-3
   
Employee Job Task Analysis
TFC-ESHQ-IH-C-17, Rev. A-5

Chemical Management
TFC-OPS-WM-C-35, Rev. B-1  

Managing Tank Chemical Vapors
TFC-ESHQ-IH-C-48, Rev. B-1  
    
Asbestos Exposure Control and Management
TFC-ESHQ-ENV-STD-13, Rev. A-7

Laser Safety
TFC-ESHQ-IH-C-54, Rev. A-1

Ergonomics
TFC-ESHQ-IH-STD-16, Rev. A-3

SAFETY - INDUSTRIAL HYGIENE STANDARDS

Cold Stress 
TFC-ESHQ-IH-STD-01, Rev. A-13 

Lead Control Program
TFC-ESHQ-IH-STD-08, Rev. C-5

Carcinogen Control
TFC-ESHQ-IH-STD-11, Rev. A-9

Illumination
TFC-ESHQ-IH-STD-13, Rev. A-4

Noise Identification and Hearing Conversation Program
TFC-ESHQ-IH-STD-18, Rev. B-0

SAFETY - INDUSTRIAL SAFETY
 
Scaffolding
TFC-ESHQ-S_IS-C-01, Rev. B-1
     
Personal Protective Equipment
TFC-ESHQ-S_IS-C-02, Rev. B-43

Powered Industrial Trucks
TFC-ESHQ-S_IS-C-07, Rev. A-11

Implementation of DOE-0344, Hanford Site, Excavating, Trenching, and Shoring Procedure (HSETSP) 
TFC-ESHQ-S-STD-30, Rev. D-2
  
SAFETY - SAFETY MANAGEMENT 
    
Safety Communications
TFC-ESHQ-S_SAF-CD-10, Rev. B-2

Job Hazard Analysis
TFC-ESHQ-S_SAF-C-02, Rev. G-15
     
Issue and Control of Insulated Rubber Gloves
TFC-ESHQ-S_SAF-C-05, Rev. B-2

ESH&Q Program Assessment Plan
TFC-PLN-119, Rev. D-5

NRTL Requirements for Electrical Equipment
TFC-ESHQ-S_SAF-C-09, Rev. D-1

Safety Inspections
TFC-ESHQ-S_SAF-C-12, Rev. D-3

SAFETY - STANDARDS
 
Ladders
TFC-ESHQ-S-STD-01, Rev. G-2
   
Motor Vehicle Safety
TFC-ESHQ-S-STD-02, Rev. C-4
 
First Aid
TFC-ESHQ-S-STD-04, Rev. A-15
   
Walking and Working Surfaces
TFC-ESHQ-S-STD-05, Rev. B-14
    
Office Safety
TFC-ESHQ-S-STD-11, Rev. A-10
   
Elevating Work Platforms
TFC-ESHQ-S-STD-12, Rev. A-9
   
Hand and Portable Power Tools
TFC-ESHQ-S-STD-13, Rev. A-11
   
Safety Signs, Tags, Barriers, and Color Coding
TFC-ESHQ-S-STD-18, Rev. B-5
   
Emergency Shower, Eyewash, and Decontamination Facility Operation Standard
TFC-ESHQ-S-STD-19, Rev. C-6

Machine Guarding
TFC-ESHQ-S-STD-21, Rev. A-4
  
Bloodborne Pathogen Exposure Control Standard
TFC-ESHQ-S-STD-24, Rev. A-8 
 
Storing, Using, Handling, and Transporting Compressed and Liquefied Gases
TFC-ESHQ-S-STD-25, C-7

Housekeeping/Sanitation
TFC-ESHQ-S-STD-27, A-8

Implementation of DOE-0360, Hanford Site Confined Space Procedure (HSCSP)
TFC-ESHQ-S-STD-31, Rev. A-11

RADIATION PROTECTION DOSIMETRY OPERATIONS
 
External Dosimetry
TFC-ESHQ-RP_DOS-C-03, Rev. C-1

Internal Dosimetry
TFC-ESHQ-RP_DOS-C-04, Rev. B-15

HOISTING AND RIGGING

Flammable Gas Activities Ignition Control
TFC-ENG-FACSUP-P-17, Rev. H-13

Hoisting, Rigging, Load Handling, and Transport
TFC-ENG-FACSUP-C-25, Rev. E-6

QUALITY CONTROL

Control of Suspect/Counterfeit Items
TFC-ESHQ-Q_C-C-03, Rev. D-1

ENGINEERING

Human Factors in Design
TFC-ENG-STD-01, Rev. A-7

Environmental/Seasonal Requirements for TOC Systems, Structures, and Components
TFC-ENG-STD-02, Rev. B-2

Design Loads for Tank Farm Facilities
TFC-ENG-STD-06, Rev. E-1

Heating Ventilation, Air Conditioning & Refrigeration (HVAC&R) System Design Standard
TFC-ENG-STD-07, Rev. J-0

Drawing Standard
TFC-ENG-STD-10, Rev. A-21

TOC Equipment Identification Numbering and Labeling Standard
TFC-ENG-STD-12, Rev. E-6

Setpoint Standard
TFC-ENG-STD-14, Rev. C-6

Standard for Raceway Systems and Flexible Cords & Cables
TFC-ENG-STD-15, Rev. C-8

Vendor Calculation Standard
TFC-ENG-STD-51, Rev. B-0

Engineering Change Control
TFC-ENG-DESIGN-C-06, Rev. M-2

Engineering Drawings
TFC-ENG-DESIGN-C-09, Rev. E-13

Engineering Calculations
TFC-ENG-DESIGN-C-10, Rev. B-19

Testing Practices
TFC-ENG-DESIGN-C-18, Rev. B-3

Technical Document Control
TFC-ENG-DESIGN-C-25, Rev. G-12

Utility Calculation Software Management
TFC-ENG-DESIGN-C-32, Rev. H-9

Development of Technical Requirements for Procurements
TFC-ENG-DESIGN-C-34, Rev. D-1

Design Requirements Compliance Matrix
TFC-ENG-DESIGN-C-42, Rev. A-9

Project Design Review Guidance
TFC-ENG-DESIGN-D-17.1, Rev. B-6

Structural Integrity Verification of Lifting Points
TFC-ENG-DESIGN-D-37, Rev. A-6

Equivalent Replacement
TFC-ENG-DESIGN-P-16, Rev. C-3

Design Verification
TFC-ENG-DESIGN-P-17, Rev. E-2

Technical Reviews
TFC-ENG-DESIGN-C-52, Rev. C-7

Checking of Engineering Documents
TFC-ENG-DESIGN-P-54, Rev. A-14

Modification Traveler
TFC-ENG-DESIGN-C-56, Rev. D-7

Independent Qualified Registered Professional Engineer Assessment Process
TFC-ESHQ-ENV_PP-C-11, Rev. C-2

APPROVED RECORD FILE FORMATS
 
Approved Record File Formats
 

 

Last Updated 09/21/2023 6:48 AM